ITAC Assessment: WV0346
ITAC logo
ITAC Assessment: WV0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product chemicals for the oil and natural gas drilling industry
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 19
Plant Area 100,400
ft2
Annual Production 22,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,842 1,283,073
kWh
Natural Gas $130,136 9,538
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,304 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.7124: Make a practice of turning off lights when not needed $12,230 $1,143 $12,230
174
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,998 $13,688 $9,998
142,758
kWh
- -
03 2.7231: Use radiant heater for spot heating $4,996 $8,800 - $4,996
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,442 $4,540 $2,442
34,867
kWh
- -
05 2.2437: Recover waste heat from equipment $1,952 $656 - $1,952
-
MMBtu
-
06 2.2511: Insulate bare equipment $1,502 $737 - $1,502
-
MMBtu
-
07 2.4151: Develop a repair/replace policy $850 $230 $1,498
21,389
kWh
- $(-648.0)
08 2.4231: Reduce the pressure of compressed air to the minimum required $800 $14 $800
11,347
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $534 $131 $534
7,576
kWh
- -
TOTAL RECOMMENDED $35,304 $29,939 $27,502
218,111
kWh
$8,450
-
MMBtu
$(-648.0)
TOTAL IMPLEMENTED $25,380 $15,812 $24,526
175,668
kWh
$1,502
-
MMBtu
$(-648.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs