ITAC Assessment: SU0270
ITAC logo
ITAC Assessment: SU0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Corrugated Packaging
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 164
Plant Area 184,960
ft2
Annual Production 737,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $317,496 3,895,651
kWh
Electricity Demand $27,908 9,396
kW-mo/yr
Electricity Fees $47,134 -
Natural Gas $468,166 51,428
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,586 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $99,533

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $8,101 - $7,573
92,352
kWh
$528
-
kW-mo/yr
- - - - -
02 2.4314: Use synthetic lubricant $952 - $890
10,856
kWh
$62
-
kW-mo/yr
- - - - -
03 2.2135: Repair and eliminate steam leaks $48,133 $1,453 - - - $40,008
-
MMBtu
- $7,197 $928
-
Tgal
04 2.4221: Install compressor air intakes in coolest locations $5,122 $129 $4,789
58,406
kWh
$333
-
kW-mo/yr
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,799 $1,379 $7,291
88,920
kWh
$508
-
kW-mo/yr
- - - - -
06 2.7135: Install occupancy sensors $393 $175 $393
4,792
kWh
- - - - - -
07 2.2414: Use waste heat from hot flue gases to preheat $23,234 $18,896 - - - $23,234
-
MMBtu
- - -
08 2.2136: Install / repair insulation on steam lines $392 $430 - - - $392
-
MMBtu
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $259 $317 $101
1,226
kWh
$6
-
kW-mo/yr
- - $61 $91 -
10 2.3212: Optimize plant power factor $2,250 $2,850 - - $2,250 - - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $11,767 $22,925 $11,001
134,160
kWh
$766
-
kW-mo/yr
- - - - -
12 2.6211: Conserve energy by efficient use of vending machines $184 $472 $184
2,247
kWh
- - - - - -
TOTAL RECOMMENDED $108,586 $49,026 $32,222
392,959
kWh
$2,203
-
kW-mo/yr
$2,250 $63,634
-
MMBtu
$61 $7,288 $928
-
Tgal
TOTAL IMPLEMENTED $99,533 $49,026 $23,759
289,751
kWh
$1,613
-
kW-mo/yr
$2,250 $63,634
-
MMBtu
$61 $7,288 $928
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs