ITAC Assessment: OR0751
ITAC logo
ITAC Assessment: OR0751
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Conveying Floors
NAICS 333922: Conveyor and Conveying Equipment Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 240
Plant Area 270,000
ft2
Annual Production 3,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,314 2,745,910
kWh
Electricity Demand $86,146 10,630
kW-mo/yr
Electricity Fees $38,254 -
Natural Gas $85,662 12,247
MMBtu
TOTAL YEARLY COSTS $354,375
RECOMMENDED SAVINGS* $90,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Usage Savings Administrative Changes Savings By-product Production Savings Increase in Production Savings
01 4.431: Train operators for maximum operating efficiency $12,526 $140 - - - - $12,526
02 2.4239: Eliminate or reduce compressed air usage $1,956 $1,175 $1,956
29,086
kWh
- - - -
03 3.5111: Filter and reuse hydraulic oil $74,774 $48,589 - $73
-
Tgal
$(-734.0) $75,435 -
04 2.4226: Use / purchase optimum sized compressor $1,125 $1,272 $1,125
16,730
kWh
- - - -
TOTAL RECOMMENDED $90,381 $51,176 $3,081
45,816
kWh
$73
-
Tgal
$(-734.0) $75,435 $12,526
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs