62
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Surface active agent manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IC0185 #02 Y:2011 | 02 | 2011 | Purchase new equipment to reduce material use / cost | $66,621 | $315,096 |
n/a
|
| IC0185 #01 Y:2011 | 01 | 2011 | Repair and eliminate steam leaks | $1,075 | $200 | |
| UD0832 #12 Y:2010 | 12 | 2010 | Recover waste heat from equipment | $2,554 | $5,000 | |
| UD0832 #11 Y:2010 | 11 | 2010 | Analyze flue gas for proper air/fuel ratio | $11,335 | $2,620 | |
| UD0832 #10 Y:2010 | 10 | 2010 | Repair or replace steam traps | $14,246 | $2,000 | |
| UD0832 #09 Y:2010 | 09 | 2010 | Recover waste heat from equipment | $25,624 | $5,000 | |
| UD0832 #08 Y:2010 | 08 | 2010 | Use flow control valves on equipment to optimize water use | $5,424 | $500 | |
| UD0832 #07 Y:2010 | 07 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $986 | $500 | |
| UD0832 #06 Y:2010 | 06 | 2010 | Upgrade obsolete equipment | $4,243 | $4,728 | |
| UD0832 #05 Y:2010 | 05 | 2010 | Use adjustable frequency drive or multiple speed motors on existing system | $9,473 | $16,265 | |
| UD0832 #04 Y:2010 | 04 | 2010 | Use adjustable frequency drive or multiple speed motors on existing system | $56,419 | $39,141 | |
| UD0832 #03 Y:2010 | 03 | 2010 | Install occupancy sensors | $1,977 | $1,063 | |
| UD0832 #02 Y:2010 | 02 | 2010 | Disconnect ballasts | $2,570 | $250 | |
| UD0832 #01 Y:2010 | 01 | 2010 | Utilize higher efficiency lamps and/or ballasts | $14,751 | $40,000 | |
| DL0018 #12 Y:2008 | 12 | 2008 | Reduce ventilation air | $5,870 | - | |
| DL0018 #11 Y:2008 | 11 | 2008 | Utilize higher efficiency lamps and/or ballasts | $14,300 | $183,000 | |
| DL0018 #10 Y:2008 | 10 | 2008 | Use solar heat to heat water | $26,000 | $175,000 | |
| DL0018 #09 Y:2008 | 09 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $33,200 | $16,000 | |
| DL0018 #08 Y:2008 | 08 | 2008 | Use flue gases to heat process or service water | $44,400 | $35,000 | |
| DL0018 #07 Y:2008 | 07 | 2008 | Recover waste heat from equipment | $56,800 | $129,000 |