223
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Soap and other detergent manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0739 #04 Y:2014 | 04 | 2014 | Utilize controls to operate equipment only when needed | $880 | $1,285 | |
| MA0739 #03 Y:2014 | 03 | 2014 | Install / repair insulation on steam lines | $927 | $1,570 | |
| MA0739 #02 Y:2014 | 02 | 2014 | Turn off equipment when not in use | $1,543 | $500 | |
| MA0739 #01 Y:2014 | 01 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $5,369 | $11,834 | |
| BD0433 #09 Y:2013 | 09 | 2013 | Utilize higher efficiency lamps and/or ballasts | $219 | $411 | |
| BD0433 #08 Y:2013 | 08 | 2013 | Reduce the pressure of compressed air to the minimum required | $1,387 | $20 | |
| BD0433 #07 Y:2013 | 07 | 2013 | Utilize higher efficiency lamps and/or ballasts | $1,418 | $2,940 | |
| BD0433 #06 Y:2013 | 06 | 2013 | Install compressor air intakes in coolest locations | $2,374 | $1,000 | |
| BD0433 #05 Y:2013 | 05 | 2013 | Install occupancy sensors | $3,381 | $4,425 | |
| BD0433 #04 Y:2013 | 04 | 2013 | Utilize higher efficiency lamps and/or ballasts | $3,619 | $3,573 | |
| BD0433 #03 Y:2013 | 03 | 2013 | Direct warmest air to combustion intake | $4,679 | $11,000 | |
| BD0433 #02 Y:2013 | 02 | 2013 | Recover waste heat from equipment | $4,907 | $9,000 | |
| BD0433 #01 Y:2013 | 01 | 2013 | Use most efficient type of electric motors | $14,316 | $21,450 | |
| LE0347 #09 Y:2012 | 09 | 2012 | Replace existing hvac unit with high efficiency model | $988 | $4,050 | |
| LE0347 #08 Y:2012 | 08 | 2012 | Repair and eliminate steam leaks | $475 | $675 | |
| LE0347 #07 Y:2012 | 07 | 2012 | Replace electrically-operated equipment with fossil fuel equipment | $4,814 | $9,000 | |
| LE0347 #06 Y:2012 | 06 | 2012 | Install partitions to reduce size of conditioned space | $10,156 | $16,300 | |
| LE0347 #05 Y:2012 | 05 | 2012 | Preheat combustion air with waste heat | $5,309 | $20,000 | |
| LE0347 #04 Y:2012 | 04 | 2012 | Analyze flue gas for proper air/fuel ratio | $653 | $2,000 | |
| LE0347 #03 Y:2012 | 03 | 2012 | Replace electrically-operated equipment with fossil fuel equipment | $6,115 | - |