Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Soap and other detergent manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0921 #09 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $1,190 $4,300
UD0921 #08 Y:2014 Turn off equipment during breaks, reduce operating time $1,618 $700
UD0921 #07 Y:2014 Install compressor air intakes in coolest locations $1,470 $1,000
UD0921 #06 Y:2014 Recover waste heat from equipment $1,838 $1,250
UD0921 #05 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $2,887 $950
UD0921 #04 Y:2014 Install / repair insulation on condensate lines $381 $275
UD0921 #03 Y:2014 Analyze flue gas for proper air/fuel ratio $723 -
UD0921 #02 Y:2014 Utilize energy-efficient belts and other improved mechanisms $405 -
UD0921 #01 Y:2014 Reduce ventilation air $16,159 -
LE0388 #08 Y:2014 Analyze flue gas for proper air/fuel ratio $272 $1,200
LE0388 #07 Y:2014 Use optimum size and capacity equipment $2,735 $9,703
LE0388 #06 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $5,432 $16,500
LE0388 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $8,333 $20,147
LE0388 #04 Y:2014 Reschedule plant operations or reduce load to avoid peaks $1,556 $3,052
LE0388 #03 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $510 $1,000
LE0388 #02 Y:2014 Use radiant heater for spot heating $11,147 $21,250
LE0388 #01 Y:2014 Recover waste heat from equipment $2,857 $1,520
MA0739 #07 Y:2014 Pay utility bills on time $426 $500
MA0739 #06 Y:2014 Utilize controls to operate equipment only when needed $475 $915
MA0739 #05 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $864 $2,635