369
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
WV0690 #12 Y:2025 | 12 | 2025 | Insulate bare equipment | $224 | $391 |
n/a
|
WV0690 #11 Y:2025 | 11 | 2025 | Eliminate or reduce compressed air usage | $648 | $782 |
n/a
|
WV0690 #10 Y:2025 | 10 | 2025 | Install occupancy sensors | $1,342 | $3,197 |
n/a
|
WV0690 #09 Y:2025 | 09 | 2025 | Install compressor air intakes in coolest locations | $1,747 | $8,115 |
n/a
|
WV0690 #08 Y:2025 | 08 | 2025 | Repair or replace steam traps | $1,772 | $8,336 |
n/a
|
WV0690 #07 Y:2025 | 07 | 2025 | Analyze flue gas for proper air/fuel ratio | $2,735 | $1,187 |
n/a
|
WV0690 #06 Y:2025 | 06 | 2025 | Recover heat from exhausted steam, hot air or hot water | $2,997 | $12,500 |
n/a
|
WV0690 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,095 | $308 |
n/a
|
WV0690 #04 Y:2025 | 04 | 2025 | Install outside air damper / economizer on hvac unit | $6,161 | $28,584 |
n/a
|
WV0690 #03 Y:2025 | 03 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $6,537 | $11,140 |
n/a
|
WV0690 #02 Y:2025 | 02 | 2025 | Upgrade controls on compressors | $6,659 | $13,993 |
n/a
|
WV0690 #01 Y:2025 | 01 | 2025 | Reduce ventilation air | $61,627 | $6,564 |
n/a
|
LS2414 #05 Y:2024 | 05 | 2024 | Replace boiler | $58,575 | $420,000 | |
LS2414 #04 Y:2024 | 04 | 2024 | Replace existing chiller with high efficiency model | $810,158 | $2,364,120 | |
LS2414 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,889 | $1,050 | |
LS2414 #02 Y:2024 | 02 | 2024 | Use / purchase optimum sized compressor | $265,645 | $63,000 | |
LS2414 #01 Y:2024 | 01 | 2024 | Install occupancy sensors | $2,180 | $250 | |
IP0193 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $513 | $972 | |
IP0193 #05 Y:2024 | 05 | 2024 | Use immersion heating in tanks, melting pots, etc | $2,202 | $1,165 | |
IP0193 #04 Y:2024 | 04 | 2024 | Recover waste heat from equipment | $28,687 | $10,184 |