ITAC Assessment: TR0076
ITAC logo
ITAC Assessment: TR0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Aloe Vera Juice, Concentrate, and Powder
NAICS 325611: Soap and Other Detergent Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area 67,500
ft2
Annual Production 1,509
ton
Production Hrs. Annual 1,880
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,419 1,177,260
kWh
Electricity Demand $50,860 4,150
kW-mo/yr
Electricity Fees $2,249 -
TOTAL YEARLY COSTS $117,527
RECOMMENDED SAVINGS* $70,415 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $875 $1,651 $360
6,580
kWh
$515
-
kW-mo/yr
02 2.7135: Install occupancy sensors $381 $676 $157
2,865
kWh
$224
-
kW-mo/yr
03 2.9114: Use solar heat to make electricty $68,125 $307,000 $63,139
1,153,853
kWh
$4,986
-
kW-mo/yr
04 2.4322: Use or replace with energy efficient substitutes $1,035 $5,435 $479
8,755
kWh
$556
-
kW-mo/yr
TOTAL RECOMMENDED $70,415 $314,762 $64,135
1,172,054
kWh
$6,281
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs