Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

582

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Soap, cleaning compound, and toilet preparation manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2414 #05 Y:2024 Replace boiler $58,575 $420,000
LS2414 #04 Y:2024 Replace existing chiller with high efficiency model $810,158 $2,364,120
LS2414 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,889 $1,050
LS2414 #02 Y:2024 Use / purchase optimum sized compressor $265,645 $63,000
LS2414 #01 Y:2024 Install occupancy sensors $2,180 $250
IP0193 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $513 $972
IP0193 #05 Y:2024 Use immersion heating in tanks, melting pots, etc $2,202 $1,165
IP0193 #04 Y:2024 Recover waste heat from equipment $28,687 $10,184
IP0193 #03 Y:2024 Conserve energy by efficient use of vending machines $1,590 -
IP0193 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,007 $104
IP0193 #01 Y:2024 Eliminate or reduce compressed air usage $6,354 -
IP0192 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,546 $2,248
IP0192 #06 Y:2024 Use immersion heating in tanks, melting pots, etc $1,077 $1,105
IP0192 #05 Y:2024 Install occupancy sensors $1,967 $1,205
IP0192 #04 Y:2024 Recover waste heat from equipment $3,831 $1,865
IP0192 #03 Y:2024 Reduce space conditioning during non-working hours $1,767 $448
IP0192 #02 Y:2024 Conserve energy by efficient use of vending machines $546 -
IP0192 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,354 $35
UU0241 #08 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $589 $750
UU0241 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $650 $2,200