45
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1089 #06 Y:2024 | 06 | 2024 | Use waste heat from hot flue gases to preheat | $6,228 | $27,650 | |
| UD1089 #05 Y:2024 | 05 | 2024 | Install occupancy sensors | $472 | $550 | |
| UD1089 #04 Y:2024 | 04 | 2024 | Install compressor air intakes in coolest locations | $7,169 | $2,030 | |
| UD1089 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,974 | - | |
| UD1089 #02 Y:2024 | 02 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $30,384 | - | |
| UD1089 #01 Y:2024 | 01 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $79,860 | - | |
| UD0898 #08 Y:2013 | 08 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $309 | - | |
| UD0898 #07 Y:2013 | 07 | 2013 | Reduce the pressure of compressed air to the minimum required | $621 | $20 | |
| UD0898 #06 Y:2013 | 06 | 2013 | Utilize higher efficiency lamps and/or ballasts | $1,748 | $2,320 | |
| UD0898 #05 Y:2013 | 05 | 2013 | Install motor voltage controller on lightly loaded motors | $8,127 | $6,567 | |
| UD0898 #04 Y:2013 | 04 | 2013 | Cover open tanks | $57 | $200 | |
| UD0898 #03 Y:2013 | 03 | 2013 | Analyze flue gas for proper air/fuel ratio | $778 | - | |
| UD0898 #02 Y:2013 | 02 | 2013 | Reduce space conditioning during non-working hours | $11,196 | $300 | |
| UD0898 #01 Y:2013 | 01 | 2013 | Utilize energy-efficient belts and other improved mechanisms | $156 | $50 | |
| UD0886 #16 Y:2013 | 16 | 2013 | Reduce ventilation air | $32,467 | $20,000 | |
| UD0886 #15 Y:2013 | 15 | 2013 | Replace city water with recycled water via cooling tower | $9,716 | $30,000 | |
| UD0886 #14 Y:2013 | 14 | 2013 | Install smaller boiler (increase high fire duty cycle) | $2,995 | - | |
| UD0886 #13 Y:2013 | 13 | 2013 | Analyze flue gas for proper air/fuel ratio | $3,167 | - | |
| UD0886 #12 Y:2013 | 12 | 2013 | Insulate glazing, walls, ceilings, and roofs | $3,648 | $6,720 | |
| UD0886 #11 Y:2013 | 11 | 2013 | Analyze flue gas for proper air/fuel ratio | $341 | - |