Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Paint and coating manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1089 #06 Y:2024 Use waste heat from hot flue gases to preheat $6,228 $27,650
UD1089 #05 Y:2024 Install occupancy sensors $472 $550
UD1089 #04 Y:2024 Install compressor air intakes in coolest locations $7,169 $2,030
UD1089 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $8,974 -
UD1089 #02 Y:2024 Utilize energy-efficient belts and other improved mechanisms $30,384 -
UD1089 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $79,860 -
UD0898 #08 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $309 -
UD0898 #07 Y:2013 Reduce the pressure of compressed air to the minimum required $621 $20
UD0898 #06 Y:2013 Utilize higher efficiency lamps and/or ballasts $1,748 $2,320
UD0898 #05 Y:2013 Install motor voltage controller on lightly loaded motors $8,127 $6,567
UD0898 #04 Y:2013 Cover open tanks $57 $200
UD0898 #03 Y:2013 Analyze flue gas for proper air/fuel ratio $778 -
UD0898 #02 Y:2013 Reduce space conditioning during non-working hours $11,196 $300
UD0898 #01 Y:2013 Utilize energy-efficient belts and other improved mechanisms $156 $50
UD0886 #16 Y:2013 Reduce ventilation air $32,467 $20,000
UD0886 #15 Y:2013 Replace city water with recycled water via cooling tower $9,716 $30,000
UD0886 #14 Y:2013 Install smaller boiler (increase high fire duty cycle) $2,995 -
UD0886 #13 Y:2013 Analyze flue gas for proper air/fuel ratio $3,167 -
UD0886 #12 Y:2013 Insulate glazing, walls, ceilings, and roofs $3,648 $6,720
UD0886 #11 Y:2013 Analyze flue gas for proper air/fuel ratio $341 -