Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

759

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Paint, coating, and adhesive manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0039 #10 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $12,653 $10,067
SJ0039 #09 Y:2025 Utilize energy-efficient belts and other improved mechanisms $731 $114
SJ0039 #08 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $1,332 $4,500
SJ0039 #07 Y:2025 Reduce the pressure of compressed air to the minimum required $758 -
SJ0039 #06 Y:2025 Install vinyl strip / high speed / air curtain doors $48,587 $3,938
SJ0039 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,430 $15,514
SJ0039 #04 Y:2025 Install occupancy sensors $5,502 $3,262
SJ0039 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $7,039 $28,758
SJ0039 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $14,291 -
SJ0039 #01 Y:2025 Use solar heat to make electricty $39,455 $171,206
TT0337 #09 Y:2025 Recover waste heat from equipment $2,714 $5,000
TT0337 #08 Y:2025 Establish a predictive maintenance program $108,000 $12,300
TT0337 #07 Y:2025 Use optimum size and capacity equipment $2,382 $16,500
TT0337 #06 Y:2025 Improve combustion control capability $2,372 $1,000
TT0337 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,274 $12,000
TT0337 #04 Y:2025 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $210 $500
TT0337 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $6,154 $1,570
TT0337 #02 Y:2025 Convert to oxyfuel burners $37,798 $25,000
TT0337 #01 Y:2025 Use insulation in furnaces to facilitate heating / cooling $1,309 $1,884
SJ0038 #09 Y:2025 Utilize energy-efficient belts and other improved mechanisms $127 $25