Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

731

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Paint, coating, and adhesive manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0807 #04 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $3,635 $16,079
OR0807 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $753 $2,323
OR0807 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,721 $7,534
OR0807 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $8,168 $10,530
MU0065 #19 Y:2025 Use solar heat to make electricty $64,482 $677,600
MU0065 #18 Y:2025 Close holes and openings in building such as broken windows $703 -
MU0065 #17 Y:2025 Reduce space conditioning during non-working hours $3,384 -
MU0065 #16 Y:2025 Utilize higher efficiency lamps and/or ballasts $54 $669
MU0065 #15 Y:2025 Install occupancy sensors $327 $376
MU0065 #14 Y:2025 Utilize higher efficiency lamps and/or ballasts $533 $191
MU0065 #13 Y:2025 Reduce illumination to minimum necessary levels $116 -
MU0065 #12 Y:2025 Turn off equipment when not in use $2,961 -
MU0065 #11 Y:2025 Turn off equipment when not in use $11,359 -
MU0065 #10 Y:2025 Conserve energy by efficient use of vending machines $517 $197
MU0065 #09 Y:2025 Keep equipment clean $1,263 -
MU0065 #08 Y:2025 Use or replace with energy efficient substitutes $67,736 $200,000
MU0065 #07 Y:2025 Use or replace with energy efficient substitutes $80,013 $191,880
MU0065 #06 Y:2025 Use or replace with energy efficient substitutes $23,749 $57,720
MU0065 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $774 $100
MU0065 #04 Y:2025 Install compressor air intakes in coolest locations $6,871 $2,283