683
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UL2416 #13 Y:2024 | 13 | 2024 | Use solar heat to make electricty | $19,610 | $190,384 |
n/a
|
UL2416 #12 Y:2024 | 12 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $1,386 | $1,600 |
n/a
|
UL2416 #11 Y:2024 | 11 | 2024 | Preheat combustion air with waste heat | $9,389 | $10,000 |
n/a
|
UL2416 #10 Y:2024 | 10 | 2024 | Use waste heat from hot flue gases to preheat | $9,389 | $25,000 |
n/a
|
UL2416 #09 Y:2024 | 09 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,542 | $1,170 |
n/a
|
UL2416 #08 Y:2024 | 08 | 2024 | Insulate bare equipment | $1,134 | $330 |
n/a
|
UL2416 #07 Y:2024 | 07 | 2024 | Install / repair insulation on steam lines | $743 | $660 |
n/a
|
UL2416 #06 Y:2024 | 06 | 2024 | Use outside cold water source as a supply of cooling water | $23,980 | $43,234 |
n/a
|
UL2416 #05 Y:2024 | 05 | 2024 | Lower ceiling to reduce conditioned space | $4,975 | $8,000 |
n/a
|
UL2416 #04 Y:2024 | 04 | 2024 | Install occupancy sensors | $139 | $469 |
n/a
|
UL2416 #03 Y:2024 | 03 | 2024 | Install spectral reflectors / delamp | $276 | - |
n/a
|
UL2416 #02 Y:2024 | 02 | 2024 | Utilize higher efficiency lamps and/or ballasts | $565 | $273 |
n/a
|
UL2416 #01 Y:2024 | 01 | 2024 | Optimize plant power factor | $20,797 | $16,250 |
n/a
|
WM0225 #05 Y:2024 | 05 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $1,246 | $1,375 |
n/a
|
WM0225 #04 Y:2024 | 04 | 2024 | Recharge batteries on during off-peak demand periods | $3,687 | $4,037 |
n/a
|
WM0225 #03 Y:2024 | 03 | 2024 | Install compressor air intakes in coolest locations | $6,067 | $5,244 |
n/a
|
WM0225 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $25,176 | - |
n/a
|
WM0225 #01 Y:2024 | 01 | 2024 | Preheat combustion air with waste heat | $43,885 | $200,000 |
n/a
|
UD1089 #06 Y:2024 | 06 | 2024 | Use waste heat from hot flue gases to preheat | $6,228 | $27,650 |
n/a
|
UD1089 #05 Y:2024 | 05 | 2024 | Install occupancy sensors | $472 | $550 |
n/a
|