Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Biological product (except diagnostic) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0665 #06 Y:2024 Replace existing chiller with high efficiency model $74,386 $209,425
SD0665 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $3,342 $2,233
SD0665 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $58,983 $101,750
SD0665 #03 Y:2024 Adopt in-house material generation $23,739 $46,406
SD0665 #02 Y:2024 Use battery storage for demand control $203,574 $5,892
SD0665 #01 Y:2024 Use solar heat to make electricty $614,791 $395,505
SU0551 #11 Y:2024 Use solar heat to make electricty $62,603 $652,137
SU0551 #10 Y:2024 Conserve energy by efficient use of vending machines $181 -
SU0551 #09 Y:2024 Use solar heat to make electricty $9,473 $27,789
SU0551 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $669 $1,050
SU0551 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,582 -
SU0551 #06 Y:2024 Install compressor air intakes in coolest locations $4,149 $15,000
SU0551 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $585 $20,063
SU0551 #04 Y:2024 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $23,444 $5,758
SU0551 #03 Y:2024 Eliminate or reduce compressed air usage $11,772 -
SU0551 #02 Y:2024 Reduce space conditioning during non-working hours $371 -
SU0551 #01 Y:2024 Disconnect ballasts $535 -
SU0548 #10 Y:2024 Adjust / maintain fork lift trucks for most efficient operation $14,025 $12,000
SU0548 #09 Y:2024 Recover waste heat from equipment $14,839 $12,200
SU0548 #08 Y:2024 Insulate bare equipment $10,902 $52,000