ITAC Assessment: SU0548
ITAC logo
ITAC Assessment: SU0548
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Biologics Drug Substance
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 479
Plant Area 4,390,446
ft2
Annual Production 40
units
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,146,031 19,313,455
kWh
Electricity Demand $170,438 30,068
kW-mo/yr
Electricity Fees $104,868 -
Natural Gas $856,815 209,808
MMBtu
TOTAL YEARLY COSTS $2,278,153
RECOMMENDED SAVINGS* $217,454 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings Other Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $83,894 - - - - - - $83,894
02 2.8121: Apply for tax-free status for energy purchases $55,418 - - - - - - $55,418
03 2.7122: Disconnect ballasts $8,148 - $7,201
122,044
kWh
$948
-
kW-mo/yr
- - - -
04 2.3132: Recharge batteries on during off-peak demand periods $4,285 - - $4,285
-
kW-mo/yr
- - - -
05 2.4322: Use or replace with energy efficient substitutes $15,307 $1,250 $13,275
225,000
kWh
$5,951
-
kW-mo/yr
$(-3,919.1)
-
MMBtu
- - -
06 2.2113: Repair or replace steam traps $1,301 $325 - - $1,301
-
MMBtu
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $9,334 $2,970 $7,458
126,407
kWh
$1,156
-
kW-mo/yr
- - - $720
08 2.2511: Insulate bare equipment $10,902 $5,628 - - $10,902
-
MMBtu
- - -
09 2.2437: Recover waste heat from equipment $14,839 $12,200 - - $14,839
-
MMBtu
- - -
10 2.8227: Adjust / maintain fork lift trucks for most efficient operation $14,025 $12,000 $(-2,065.0)
35,000
kWh
- - $12,870
-
MMBtu
$3,220
-
MMBtu
-
TOTAL RECOMMENDED $217,454 $34,373 $25,869
508,451
kWh
$12,340
-
kW-mo/yr
$23,123
-
MMBtu
$12,870
-
MMBtu
$3,220
-
MMBtu
$140,032
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings Other Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs