Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,078

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Pharmaceutical and medicine manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0623 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,720 $4,257
SF0623 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,599 $3,962
SF0623 #03 Y:2024 Utilize controls to operate equipment only when needed $2,887 $1,146
SF0623 #02 Y:2024 Reduce ventilation air $4,851 -
SF0623 #01 Y:2024 Turn off equipment when not in use $4,288 -
UU0255 #08 Y:2024 Use / purchase optimum sized compressor $6,932 $60,862
UU0255 #07 Y:2024 Turn off equipment when not in use $4,849 $4,680
UU0255 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,033 $8,000
UU0255 #05 Y:2024 Install occupancy sensors $1,750 $4,964
UU0255 #04 Y:2024 Use optimum thickness insulation $10,948 $4,085
UU0255 #03 Y:2024 Analyze flue gas for proper air/fuel ratio $2,299 $2,614
UU0255 #02 Y:2024 Use waste heat from hot flue gases to preheat incoming fluids $5,674 $8,711
UU0255 #01 Y:2024 Purchase gas directly from a contract gas supplier $64,548 $8,000
MI0445 #08 Y:2024 Install occupancy sensors $3,269 $2,860
MI0445 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $10,583 $5,793
MI0445 #06 Y:2024 Change rate schedules or other changes in utility service $19,584 $150
MI0445 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $32,574 $11,027
MI0445 #04 Y:2024 Optimize plant power factor $46,588 $99,444
MI0445 #03 Y:2024 Pay utility bills on time $80,165 -
MI0445 #02 Y:2024 Use most efficient type of electric motors $217,248 $42,472