Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,137

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Pharmaceutical and medicine manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0811 #03 Y:2025 Use solar heat to make electricty $42,617 $404,426
OR0811 #02 Y:2025 Use or replace with energy efficient substitutes $4,192 -
OR0811 #01 Y:2025 Adopt in-house material generation $165,269 $363,639
NL0119 #05 Y:2025 Minimize boiler blowdown with better feedwater treatment $555 $3,479
NL0119 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,502 $3,500
NL0119 #03 Y:2025 Apply for tax-free status for energy purchases $13,231 $400
NL0119 #02 Y:2025 Improve air circulation with destratification fans / other methods $14,105 $5,658
NL0119 #01 Y:2025 Repair or replace steam traps $25,413 $2,500
SU0579 #11 Y:2025 Use heat pump for space conditioning $2,615 $31,920
SU0579 #10 Y:2025 Install occupancy sensors $107 $598
SU0579 #09 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $28 $100
SU0579 #08 Y:2025 Conserve energy by efficient use of vending machines $80 $188
SU0579 #07 Y:2025 Reduce space conditioning during non-working hours $153 $203
SU0579 #06 Y:2025 Use or replace with energy efficient substitutes $808 $43
SU0579 #05 Y:2025 Apply for tax-free status for energy purchases $9,467 $65
SU0579 #04 Y:2025 Reschedule plant operations or reduce load to avoid peaks $2,944 -
SU0579 #03 Y:2025 Pay bills on time to avoid late fees $530 -
SU0579 #02 Y:2025 Disconnect ballasts $94 -
SU0579 #01 Y:2025 Eliminate or reduce compressed air usage $21 -
SD0677 #08 Y:2025 Install compressor air intakes in coolest locations $3,908 $11,010