Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,190

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Pharmaceutical and medicine manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0475 #06 Y:2026 Use or replace with energy efficient substitutes $19,598 $90,000
MI0475 #05 Y:2026 Install occupancy sensors $170 $150
MI0475 #04 Y:2026 Turn off equipment when not in use $5,650 $2,600
MI0475 #03 Y:2026 Use power during off-peak periods $10,851 -
MI0475 #02 Y:2026 Lower temperature during the winter season and vice-versa $2,228 -
MI0475 #01 Y:2026 Change rate schedules or other changes in utility service $5,182 -
NT0069 #06 Y:2026 Reduce space conditioning during non-working hours $756 -
NT0069 #05 Y:2026 Apply for tax-free status for energy purchases $2,371 $5,000
NT0069 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,807 $5,753
NT0069 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $9,601 $14,343
NT0069 #02 Y:2026 Use most efficient type of electric motors $15,468 $50,649
NT0069 #01 Y:2026 Install equipment to move product $138,890 $133,700
MZ0397 #06 Y:2026 Use solar heat to heat water $1,731 $33,250
MZ0397 #05 Y:2026 Replace existing chiller with high efficiency model $88,780 $279,688
MZ0397 #04 Y:2026 Lower temperature during the winter season and vice-versa $15,228 -
MZ0397 #03 Y:2026 Install occupancy sensors $893 $1,600
MZ0397 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,988 $9,887
MZ0397 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $941 $600
SJ0047 #04 Y:2026 Use optimum temperature $2,016 -
SJ0047 #03 Y:2026 Preheat boiler makeup water with waste process heat $2,804 $626