111
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Synthetic rubber manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL2304 #05 Y:2023 | 05 | 2023 | Lower temperature during the winter season and vice-versa | $5,246 | $1,300 | |
| UL2304 #04 Y:2023 | 04 | 2023 | Use solar heat to make electricty | $8,501 | $89,882 | |
| UL2304 #03 Y:2023 | 03 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $30,148 | $36,675 | |
| UL2304 #02 Y:2023 | 02 | 2023 | Optimize plant power factor | $294,679 | $268,088 | |
| UL2304 #01 Y:2023 | 01 | 2023 | Utilize higher efficiency lamps and/or ballasts | $96,568 | $26,328 | |
| WV0643 #10 Y:2023 | 10 | 2023 | Eliminate or reduce compressed air usage | $73 | $215 | |
| WV0643 #09 Y:2023 | 09 | 2023 | Reduce the pressure of compressed air to the minimum required | $418 | $100 | |
| WV0643 #08 Y:2023 | 08 | 2023 | Upgrade controls on compressors | $603 | $1,520 | |
| WV0643 #07 Y:2023 | 07 | 2023 | Develop a repair/replace policy | $693 | $671 | |
| WV0643 #06 Y:2023 | 06 | 2023 | Install compressor air intakes in coolest locations | $829 | $2,567 | |
| WV0643 #05 Y:2023 | 05 | 2023 | Install vinyl strip / high speed / air curtain doors | $966 | $3,959 | |
| WV0643 #04 Y:2023 | 04 | 2023 | Insulate bare equipment | $1,534 | $2,013 | |
| WV0643 #03 Y:2023 | 03 | 2023 | Install set-back timers | $3,513 | $1,125 | |
| WV0643 #02 Y:2023 | 02 | 2023 | Minimize water usage | $4,332 | $20,664 | |
| WV0643 #01 Y:2023 | 01 | 2023 | Install occupancy sensors | $4,345 | $8,691 | |
| NC0643 #05 Y:2019 | 05 | 2019 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $77,463 | $300,000 | |
| NC0643 #04 Y:2019 | 04 | 2019 | Recover waste heat from equipment | $34,280 | $75,000 | |
| NC0643 #03 Y:2019 | 03 | 2019 | Utilize a less expensive cooling method | $13,881 | $30,000 | |
| NC0643 #02 Y:2019 | 02 | 2019 | Install smaller boiler (increase high fire duty cycle) | $9,495 | $1,000 | |
| NC0643 #01 Y:2019 | 01 | 2019 | Utilize higher efficiency lamps and/or ballasts | $59,445 | $139,040 |