Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Synthetic rubber manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2304 #05 Y:2023 Lower temperature during the winter season and vice-versa $5,246 $1,300
UL2304 #04 Y:2023 Use solar heat to make electricty $8,501 $89,882
UL2304 #03 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $30,148 $36,675
UL2304 #02 Y:2023 Optimize plant power factor $294,679 $268,088
UL2304 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $96,568 $26,328
WV0643 #10 Y:2023 Eliminate or reduce compressed air usage $73 $215
WV0643 #09 Y:2023 Reduce the pressure of compressed air to the minimum required $418 $100
WV0643 #08 Y:2023 Upgrade controls on compressors $603 $1,520
WV0643 #07 Y:2023 Develop a repair/replace policy $693 $671
WV0643 #06 Y:2023 Install compressor air intakes in coolest locations $829 $2,567
WV0643 #05 Y:2023 Install vinyl strip / high speed / air curtain doors $966 $3,959
WV0643 #04 Y:2023 Insulate bare equipment $1,534 $2,013
WV0643 #03 Y:2023 Install set-back timers $3,513 $1,125
WV0643 #02 Y:2023 Minimize water usage $4,332 $20,664
WV0643 #01 Y:2023 Install occupancy sensors $4,345 $8,691
NC0643 #05 Y:2019 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $77,463 $300,000
NC0643 #04 Y:2019 Recover waste heat from equipment $34,280 $75,000
NC0643 #03 Y:2019 Utilize a less expensive cooling method $13,881 $30,000
NC0643 #02 Y:2019 Install smaller boiler (increase high fire duty cycle) $9,495 $1,000
NC0643 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $59,445 $139,040