ITAC Assessment: UL2304
ITAC logo
ITAC Assessment: UL2304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Synthetic Elastomer and non-rubber elastomers
NAICS 325212: Synthetic Rubber Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 111
Plant Area 227,000
ft2
Annual Production 29,157,000
lb
Production Hrs. Annual 4,368
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,984,058 27,516,179
kWh
Natural Gas $39,695 4,376
MMBtu
TOTAL YEARLY COSTS $2,023,753
RECOMMENDED SAVINGS* $531,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $101,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $96,568 $26,328 $96,568
1,281,362
kWh
- -
02 2.3212: Optimize plant power factor $294,679 $268,088 - $294,679 -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,148 $36,675 $30,148
418,724
kWh
- -
04 2.9114: Use solar heat to make electricty $8,501 $89,882 $8,501
118,072
kWh
- -
05 2.7221: Lower temperature during the winter season and vice-versa $5,246 $1,300 $4,184
58,105
kWh
- $1,062
-
MMBtu
06 2.2692: Use outside cold water source as a supply of cooling water $84,650 $36,445 $84,650
1,175,698
kWh
- -
07 2.2437: Recover waste heat from equipment $11,731 $40,000 - - $11,731
-
MMBtu
TOTAL RECOMMENDED $531,523 $498,718 $224,051
3,051,961
kWh
$294,679 $12,793
-
MMBtu
TOTAL IMPLEMENTED $101,814 $27,628 $100,752
1,339,467
kWh
- $1,062
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs