Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin and synthetic rubber manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW0026 #06 Y:2008 Use or replace with energy efficient substitutes $11,522 $19,854
UW0026 #05 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $3,715 $200
UW0026 #04 Y:2008 Reduce the pressure of compressed air to the minimum required $2,037 -
UW0026 #03 Y:2008 Utilize higher efficiency lamps and/or ballasts $14,086 $19,000
UW0026 #02 Y:2008 Limit and control secondary combustion air in furnace $93,152 $13,100
UW0026 #01 Y:2008 Re-use or recycle hot or cold process exhaust air $324,630 $300,000
OR0534 #10 Y:2008 Use most efficient type of electric motors $447 $808
OR0534 #09 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $829 $2,700
OR0534 #08 Y:2008 Install occupancy sensors $1,219 $2,510
OR0534 #07 Y:2008 Install compressor air intakes in coolest locations $127 $125
OR0534 #06 Y:2008 Upgrade controls on compressors $1,203 -
OR0534 #05 Y:2008 Reduce the pressure of compressed air to the minimum required $271 -
OR0534 #04 Y:2008 Optimize plant power factor $6,768 $6,825
OR0534 #03 Y:2008 Change procedures / equipment / operating conditions $6,794 -
OR0534 #02 Y:2008 Replace dc equipment with ac equipment $7,700 $167,953
OR0534 #01 Y:2008 Purchase new equipment to reduce material use / cost $47,698 $19,250
OR0532 #06 Y:2008 Turn off equipment when not in use $1,195 -
OR0532 #05 Y:2008 Optimize plant power factor $13,750 $20,650
OR0532 #04 Y:2008 Change procedures / equipment / operating conditions $27,532 $49,504
OR0532 #03 Y:2008 Install occupancy sensors $4,068 $13,244