Assessment Year | 2009 |
---|---|
Principal Product | Plastics Materials and Laminates |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $50 M to 100M |
# of Employees | 80 |
Plant Area |
185,000
ft2
|
Annual Production | 100,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $167,577 | 5,120,140 |
kWh
|
$0.033 |
Electricity Demand | $40,748 | 7,111 |
kW-mo/yr
|
$5.73 |
Electricity Fees | $552 | - |
|
- |
Natural Gas | $1,459,353 | 131,000 |
MMBtu
|
$11.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $449,142 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,360 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2443: Re-use or recycle hot or cold process exhaust air | $324,630 | $300,000 | - | - |
$324,630
-
MMBtu
|
|
02 | 2.1114: Limit and control secondary combustion air in furnace | $93,152 | $13,100 | - | - |
$93,152
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,086 | $19,000 |
$11,262
344,085
kWh
|
$2,824
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,037 | - |
$1,524
46,550
kWh
|
$513
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,715 | $200 |
$2,781
84,959
kWh
|
$934
-
kW-mo/yr
|
- | |
06 | 2.4322: Use or replace with energy efficient substitutes | $11,522 | $19,854 |
$8,966
273,966
kWh
|
$2,556
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $449,142 | $352,154 |
$24,533
749,560
kWh
|
$6,827
-
kW-mo/yr
|
$417,782
-
MMBtu
|
||
TOTAL IMPLEMENTED | $31,360 | $39,054 |
$24,533
749,560
kWh
|
$6,827
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs