Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,135

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin and synthetic rubber manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0264 #07 Y:2007 Reduce the pressure of compressed air to the minimum required $3,184 $2,500
LE0264 #06 Y:2007 Reduce the pressure of compressed air to the minimum required $3,514 $200
LE0264 #05 Y:2007 Utilize energy-efficient belts and other improved mechanisms $4,084 $500
LE0264 #04 Y:2007 Repair faulty insulation in furnaces, boilers, etc $4,727 $2,250
LE0264 #03 Y:2007 Install timers and/or thermostats $4,204 $2,000
LE0264 #02 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $10,103 $2,500
LE0264 #01 Y:2007 Use or replace with energy efficient substitutes $25,680 $50,000
UD0755 #12 Y:2006 Insulate glazing, walls, ceilings, and roofs $2,928 $42,500
UD0755 #11 Y:2006 Upgrade controls on compressors $2,520 -
UD0755 #10 Y:2006 Use optimum thickness insulation $4,545 $16,005
UD0755 #09 Y:2006 Recover waste heat from equipment $11,340 $2,000
UD0755 #08 Y:2006 Use power during off-peak periods $12,404 -
UD0755 #07 Y:2006 Upgrade controls on compressors $12,600 $15,000
UD0755 #06 Y:2006 Utilize higher efficiency lamps and/or ballasts $14,952 $19,500
UD0755 #05 Y:2006 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $33,617 $337,437
UD0755 #04 Y:2006 Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $46,585 $42,000
UD0755 #03 Y:2006 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $49,140 $253,091
UD0755 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $57,728 $10,396
UD0755 #01 Y:2006 Enhance sensitivity of temperature control and cutoff $73,500 $147,000
GT0833 #08 Y:2006 Eliminate or reduce compressed air usage $36,891 $62,250