1,135
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0264 #07 Y:2007 | 07 | 2007 | Reduce the pressure of compressed air to the minimum required | $3,184 | $2,500 | |
| LE0264 #06 Y:2007 | 06 | 2007 | Reduce the pressure of compressed air to the minimum required | $3,514 | $200 | |
| LE0264 #05 Y:2007 | 05 | 2007 | Utilize energy-efficient belts and other improved mechanisms | $4,084 | $500 | |
| LE0264 #04 Y:2007 | 04 | 2007 | Repair faulty insulation in furnaces, boilers, etc | $4,727 | $2,250 | |
| LE0264 #03 Y:2007 | 03 | 2007 | Install timers and/or thermostats | $4,204 | $2,000 | |
| LE0264 #02 Y:2007 | 02 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,103 | $2,500 | |
| LE0264 #01 Y:2007 | 01 | 2007 | Use or replace with energy efficient substitutes | $25,680 | $50,000 | |
| UD0755 #12 Y:2006 | 12 | 2006 | Insulate glazing, walls, ceilings, and roofs | $2,928 | $42,500 | |
| UD0755 #11 Y:2006 | 11 | 2006 | Upgrade controls on compressors | $2,520 | - | |
| UD0755 #10 Y:2006 | 10 | 2006 | Use optimum thickness insulation | $4,545 | $16,005 | |
| UD0755 #09 Y:2006 | 09 | 2006 | Recover waste heat from equipment | $11,340 | $2,000 | |
| UD0755 #08 Y:2006 | 08 | 2006 | Use power during off-peak periods | $12,404 | - | |
| UD0755 #07 Y:2006 | 07 | 2006 | Upgrade controls on compressors | $12,600 | $15,000 | |
| UD0755 #06 Y:2006 | 06 | 2006 | Utilize higher efficiency lamps and/or ballasts | $14,952 | $19,500 | |
| UD0755 #05 Y:2006 | 05 | 2006 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $33,617 | $337,437 | |
| UD0755 #04 Y:2006 | 04 | 2006 | Replace electric motors with back pressure steam turbines and use exhaust steam for process heat | $46,585 | $42,000 | |
| UD0755 #03 Y:2006 | 03 | 2006 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $49,140 | $253,091 | |
| UD0755 #02 Y:2006 | 02 | 2006 | Utilize higher efficiency lamps and/or ballasts | $57,728 | $10,396 | |
| UD0755 #01 Y:2006 | 01 | 2006 | Enhance sensitivity of temperature control and cutoff | $73,500 | $147,000 | |
| GT0833 #08 Y:2006 | 08 | 2006 | Eliminate or reduce compressed air usage | $36,891 | $62,250 |