Assessment Year 2007
Principal Product Thermoplastic Compounds
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 194,447
ft2
Annual Production 1,700
ton
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $560,464 7,112,361
kWh
Electricity Demand $106,612 16,529
kW-mo/yr
Natural Gas $113,894 6,989
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,678 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,543

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
01 2.4322: Use or replace with energy efficient substitutes $25,680 $50,000 - - - $25,680
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,103 $2,500 $9,046
114,525
kWh
$1,057
-
kW-mo/yr
- -
03 2.7261: Install timers and/or thermostats $4,204 $2,000 - - $4,204
-
MMBtu
-
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $4,727 $2,250 $4,233
53,587
kWh
$494
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,084 $500 $3,564
45,118
kWh
$520
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,514 $200 $3,147
39,831
kWh
$367
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,184 $2,500 $2,852
36,097
kWh
$332
-
kW-mo/yr
- -
08 2.4314: Use synthetic lubricant $3,151 $500 $2,822
35,718
kWh
$329
-
kW-mo/yr
- -
09 2.1131: Repair faulty insulation in furnaces, boilers, etc $2,674 $5,000 - - $2,674
-
MMBtu
-
10 2.4221: Install compressor air intakes in coolest locations $1,288 $1,000 $1,166
14,758
kWh
$122
-
kW-mo/yr
- -
11 2.7135: Install occupancy sensors $3,069 $750 $3,069
29,447
kWh
- - -
TOTAL RECOMMENDED $65,678 $67,200 $29,899
369,081
kWh
$3,221
-
kW-mo/yr
$6,878
-
MMBtu
$25,680
TOTAL IMPLEMENTED $48,543 $58,500 $16,628
210,498
kWh
$2,031
-
kW-mo/yr
$4,204
-
MMBtu
$25,680
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs