Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,150

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin and synthetic rubber manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0422 #10 Y:2010 Install / repair insulation on steam lines $750 $329
WV0422 #09 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $954 $363
WV0422 #08 Y:2010 Reduce the pressure of compressed air to the minimum required $1,008 $50
WV0422 #07 Y:2010 Use waste heat from flue gases to heat space conditioning air $1,500 $2,875
WV0422 #06 Y:2010 Install compressor air intakes in coolest locations $1,969 $920
WV0422 #05 Y:2010 Develop a repair/replace policy $2,822 $1,150
WV0422 #04 Y:2010 Establish a predictive maintenance program $3,049 $2,000
WV0422 #03 Y:2010 Analyze flue gas for proper air/fuel ratio $4,167 $1,000
WV0422 #02 Y:2010 Change zone reheat coils to variable air volume boxes $9,494 $17,598
WV0422 #01 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $29,044 $18,250
AM0587 #09 Y:2010 Use synthetic lubricant $980 -
AM0587 #08 Y:2010 Make a practice of turning off lights when not needed $1,521 $560
AM0587 #07 Y:2010 Install skylights $2,550 $2,030
AM0587 #06 Y:2010 Analyze flue gas for proper air/fuel ratio $3,250 $500
AM0587 #05 Y:2010 Reduce the pressure of compressed air to the minimum required $4,760 $42
AM0587 #04 Y:2010 Optimize plant power factor $5,087 $21,130
AM0587 #03 Y:2010 Install / repair insulation on steam lines $5,760 $1,030
AM0587 #02 Y:2010 Utilize higher efficiency lamps and/or ballasts $7,460 $21,600
AM0587 #01 Y:2010 Repair and eliminate steam leaks $8,000 $5,000
NC0406 #11 Y:2010 Add equipment/ operators to reduce production bottleneck $20,625 $50,000