Assessment Year | 2010 |
---|---|
Principal Product | acrylic and polyester resins |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $50 M to 100M |
# of Employees | 36 |
Plant Area |
650,000
ft2
|
Annual Production | 35,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $224,443 | 5,977,334 |
kWh
|
$0.038 |
Electricity Demand | $93,475 | 13,043 |
kW-mo/yr
|
$7.17 |
Electricity Fees | $1,466 | - |
|
- |
Natural Gas | $402,072 | 85,377 |
MMBtu
|
$4.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,368 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,991 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $8,000 | $5,000 | - | - |
$8,000
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,460 | $21,600 |
$5,470
144,000
kWh
|
$1,990
-
kW-mo/yr
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $5,760 | $1,030 | - | - |
$5,760
-
MMBtu
|
|
04 | 2.3212: Optimize plant power factor | $5,087 | $21,130 | - |
$5,087
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,760 | $42 |
$3,130
82,500
kWh
|
$1,630
-
kW-mo/yr
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,250 | $500 | - | - |
$3,250
-
MMBtu
|
|
07 | 2.7145: Install skylights | $2,550 | $2,030 |
$2,550
67,200
kWh
|
- | - | |
08 | 2.7124: Make a practice of turning off lights when not needed | $1,521 | $560 |
$980
25,715
kWh
|
$541
-
kW-mo/yr
|
- | |
09 | 2.4314: Use synthetic lubricant | $980 | - |
$980
25,940
kWh
|
- | - | |
TOTAL RECOMMENDED | $39,368 | $51,892 |
$13,110
345,355
kWh
|
$9,248
-
kW-mo/yr
|
$17,010
-
MMBtu
|
||
TOTAL IMPLEMENTED | $25,991 | $28,690 |
$6,450
169,715
kWh
|
$2,531
-
kW-mo/yr
|
$17,010
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs