Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,144

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin and synthetic rubber manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0893 #03 Y:2011 Eliminate or reduce compressed air usage $41,547 $70,000
GT0893 #02 Y:2011 Change rate schedules or other changes in utility service $4,070 $4,000
GT0893 #01 Y:2011 Use synthetic lubricant $14,406 -
NC0438 #08 Y:2011 Install occupancy sensors $1,416 $2,112
NC0438 #07 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $2,224 $300
NC0438 #06 Y:2011 Develop a repair/replace policy $5,515 $5,548
NC0438 #05 Y:2011 Replace the chlorination stage with an oxygen or ozone stage $43,023 $92,800
NC0438 #04 Y:2011 Repair or replace steam traps $19,936 $5,500
NC0438 #03 Y:2011 Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $19,068 $32,000
NC0438 #02 Y:2011 Use heat from boiler blowdown to preheat boiler feed water $8,972 $7,800
NC0438 #01 Y:2011 Replace purchased steam with other energy source $62,448 $94,000
IC0182 #15 Y:2011 Conserve energy by efficient use of vending machines $110 -
IC0182 #14 Y:2011 Optimize plant power factor $3,378 $20,932
IC0182 #13 Y:2011 Minimize operation of equipment maintained in standby condition $379 $379
IC0182 #12 Y:2011 Use optimum size and capacity equipment $1,314 $1,318
IC0182 #11 Y:2011 Install compressor air intakes in coolest locations $2,294 $921
IC0182 #10 Y:2011 Install automatic stack damper $5,217 $50,324
IC0182 #09 Y:2011 Reduce combustion air flow to optimum $2,442 $311
IC0182 #08 Y:2011 Analyze flue gas for proper air/fuel ratio $950 $311
IC0182 #07 Y:2011 Install / repair insulation on steam lines $4,314 $5,489