Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,170

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin and synthetic rubber manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0497 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $7,591 $14,085
SD0497 #04 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $8,837 $1,500
SD0497 #03 Y:2015 Install timers and/or thermostats $15,039 $2,275
SD0497 #02 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $15,403 $14,111
SD0497 #01 Y:2015 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $118,874 $425,000
UD0917 #06 Y:2014 Insulate bare equipment $6,046 $6,000
UD0917 #05 Y:2014 Enhance sensitivity of temperature control and cutoff $14,607 $30,000
UD0917 #04 Y:2014 Utilize higher efficiency lamps and/or ballasts $35,576 $13,517
UD0917 #03 Y:2014 Recover and reuse cooling water $3,388 -
UD0917 #02 Y:2014 Reduce fluid flow rates $3,671 -
UD0917 #01 Y:2014 Utilize energy-efficient belts and other improved mechanisms $10,376 -
MZ0160 #10 Y:2014 Keep doors and windows shut when not on use $11,172 $24,000
MZ0160 #09 Y:2014 Lower temperature during the winter season and vice-versa $6,495 -
MZ0160 #08 Y:2014 Install compressor air intakes in coolest locations $13,300 $5,000
MZ0160 #07 Y:2014 Recover waste heat from equipment $3,778 $7,000
MZ0160 #06 Y:2014 Eliminate/reduce an operation $7,727 -
MZ0160 #05 Y:2014 Clean or color roof to reduce solar load $13,436 $24,000
MZ0160 #04 Y:2014 Use waste heat to produce steam to drive a steam turbine-generator $47,644 $117,000
MZ0160 #03 Y:2014 Replace boiler $32,000 $65,000
MZ0160 #02 Y:2014 Use waste heat from hot flue gases to preheat $7,000 $15,000