1,170
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SD0497 #05 Y:2015 | 05 | 2015 | Utilize higher efficiency lamps and/or ballasts | $7,591 | $14,085 | |
| SD0497 #04 Y:2015 | 04 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,837 | $1,500 | |
| SD0497 #03 Y:2015 | 03 | 2015 | Install timers and/or thermostats | $15,039 | $2,275 | |
| SD0497 #02 Y:2015 | 02 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $15,403 | $14,111 | |
| SD0497 #01 Y:2015 | 01 | 2015 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $118,874 | $425,000 | |
| UD0917 #06 Y:2014 | 06 | 2014 | Insulate bare equipment | $6,046 | $6,000 | |
| UD0917 #05 Y:2014 | 05 | 2014 | Enhance sensitivity of temperature control and cutoff | $14,607 | $30,000 | |
| UD0917 #04 Y:2014 | 04 | 2014 | Utilize higher efficiency lamps and/or ballasts | $35,576 | $13,517 | |
| UD0917 #03 Y:2014 | 03 | 2014 | Recover and reuse cooling water | $3,388 | - | |
| UD0917 #02 Y:2014 | 02 | 2014 | Reduce fluid flow rates | $3,671 | - | |
| UD0917 #01 Y:2014 | 01 | 2014 | Utilize energy-efficient belts and other improved mechanisms | $10,376 | - | |
| MZ0160 #10 Y:2014 | 10 | 2014 | Keep doors and windows shut when not on use | $11,172 | $24,000 | |
| MZ0160 #09 Y:2014 | 09 | 2014 | Lower temperature during the winter season and vice-versa | $6,495 | - | |
| MZ0160 #08 Y:2014 | 08 | 2014 | Install compressor air intakes in coolest locations | $13,300 | $5,000 | |
| MZ0160 #07 Y:2014 | 07 | 2014 | Recover waste heat from equipment | $3,778 | $7,000 | |
| MZ0160 #06 Y:2014 | 06 | 2014 | Eliminate/reduce an operation | $7,727 | - | |
| MZ0160 #05 Y:2014 | 05 | 2014 | Clean or color roof to reduce solar load | $13,436 | $24,000 | |
| MZ0160 #04 Y:2014 | 04 | 2014 | Use waste heat to produce steam to drive a steam turbine-generator | $47,644 | $117,000 | |
| MZ0160 #03 Y:2014 | 03 | 2014 | Replace boiler | $32,000 | $65,000 | |
| MZ0160 #02 Y:2014 | 02 | 2014 | Use waste heat from hot flue gases to preheat | $7,000 | $15,000 |