60
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DL0118 #05 Y:2013 | 05 | 2013 | Use computer programs to optimize hvac performance | $5,900 | $300 | |
| DL0118 #04 Y:2013 | 04 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $14,300 | $3,000 | |
| DL0118 #03 Y:2013 | 03 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $21,500 | $349,314 | |
| DL0118 #02 Y:2013 | 02 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $27,600 | $16,500 | |
| DL0118 #01 Y:2013 | 01 | 2013 | Insulate bare equipment | $13,600 | $800 | |
| DL0017 #06 Y:2008 | 06 | 2008 | Replace electrically-operated equipment with fossil fuel equipment | $4,572 | $165,000 | |
| DL0017 #05 Y:2008 | 05 | 2008 | Utilize higher efficiency lamps and/or ballasts | $9,006 | $26,496 | |
| DL0017 #04 Y:2008 | 04 | 2008 | Install dry sprinkler system or other method to reduce heating requirements | $6,100 | $12,100 | |
| DL0017 #03 Y:2008 | 03 | 2008 | Eliminate or reduce compressed air usage | $1,007 | $800 | |
| DL0017 #02 Y:2008 | 02 | 2008 | Utilize energy-efficient belts and other improved mechanisms | $738 | - | |
| DL0017 #01 Y:2008 | 01 | 2008 | Install compressor air intakes in coolest locations | $1,841 | - | |
| LE0196 #09 Y:2004 | 09 | 2004 | Install compressor air intakes in coolest locations | $4,088 | - | |
| LE0196 #08 Y:2004 | 08 | 2004 | Optimize plant power factor | $7,875 | $11,050 | |
| LE0196 #07 Y:2004 | 07 | 2004 | Upgrade obsolete equipment | $9,536 | $8,000 | |
| LE0196 #06 Y:2004 | 06 | 2004 | Turn off equipment when not in use | $10,457 | - | |
| LE0196 #05 Y:2004 | 05 | 2004 | Use / purchase optimum sized compressor | $11,917 | $57,000 | |
| LE0196 #04 Y:2004 | 04 | 2004 | Minimize water usage | $16,092 | $2,000 | |
| LE0196 #03 Y:2004 | 03 | 2004 | Reschedule plant operations or reduce load to avoid peaks | $19,639 | $5,000 | |
| LE0196 #02 Y:2004 | 02 | 2004 | Adopt in-house material generation | $27,869 | $27,000 | |
| LE0196 #01 Y:2004 | 01 | 2004 | Install waste heat boiler to provide direct power | $63,437 | $239,000 |