Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,250

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin, synthetic rubber, and artificial synthetic fibers and filaments manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0392 #06 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $1,532 $585
UF0392 #05 Y:2006 Use most efficient type of electric motors $535 $486
UF0392 #04 Y:2006 Utilize higher efficiency lamps and/or ballasts $3,311 $8,824
UF0392 #03 Y:2006 Install occupancy sensors $238 $228
UF0392 #02 Y:2006 Re-size charging openings or add movable cover or door $28,316 $138,000
UF0392 #01 Y:2006 Use insulation in furnaces to facilitate heating / cooling $32,112 $2,775
OK0739 #07 Y:2006 Utilize higher efficiency lamps and/or ballasts $1,734 $9,485
OK0739 #06 Y:2006 Install compressor air intakes in coolest locations $2,587 $191
OK0739 #05 Y:2006 Utilize controls to operate equipment only when needed $5,090 $7,944
OK0739 #04 Y:2006 Utilize controls to operate equipment only when needed $3,011 $390
OK0739 #03 Y:2006 Use waste heat from hot flue gases to preheat $139,230 $39,852
OK0739 #02 Y:2006 Modify process to reduce material use/cost $156,872 $2,175,000
OK0739 #01 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $2,798 $9,750
UM0315 #08 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $526 $225
UM0315 #07 Y:2006 Add area lighting switches $1,294 $1,100
UM0315 #06 Y:2006 Insulate bare equipment $1,369 $230
UM0315 #05 Y:2006 Utilize higher efficiency lamps and/or ballasts $27,713 $40,991
UM0315 #04 Y:2006 Insulate bare equipment $32,300 $80,207
UM0315 #03 Y:2006 Recover waste heat from equipment $34,667 $8,066
UM0315 #02 Y:2006 Use waste heat from hot flue gases to preheat $36,263 $15,000