Assessment Year | 2006 |
---|---|
Principal Product | Roofing Insulation Products |
NAICS | 325220: Artificial and Synthetic Fibers and Filaments Manufacturing |
SIC | 2824: Manmade Organic Fibers, Except Cellulosic |
Sales Range | n/a |
# of Employees | 45 |
Plant Area |
130,000
ft2
|
Annual Production | 162,000,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $129,338 | 2,086,680 |
kWh
|
$0.062 |
Electricity Demand | $34,739 | 6,048 |
kW-mo/yr
|
$5.74 |
Natural Gas | $65,614 | 4,632 |
MMBtu
|
$14.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,966 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,955 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $32,112 | $2,775 | - | - |
$12,144
-
MMBtu
|
$19,968 | |
02 | 2.2531: Re-size charging openings or add movable cover or door | $28,316 | $138,000 |
$1,320
16,711
kWh
|
- |
$26,996
-
MMBtu
|
- | |
03 | 2.7135: Install occupancy sensors | $238 | $228 |
$238
3,841
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,311 | $8,824 |
$2,580
41,664
kWh
|
$731
-
kW-mo/yr
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $535 | $486 |
$418
6,761
kWh
|
$117
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,532 | $585 |
$1,532
19,389
kWh
|
- | - | - | |
07 | 2.2515: Use optimum thickness insulation | $2,922 | $1,680 |
$2,922
47,130
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $68,966 | $152,578 |
$9,010
135,496
kWh
|
$848
-
kW-mo/yr
|
$39,140
-
MMBtu
|
$19,968 | ||
TOTAL IMPLEMENTED | $36,955 | $12,184 |
$4,112
61,053
kWh
|
$731
-
kW-mo/yr
|
$12,144
-
MMBtu
|
$19,968 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs