Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,250

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin, synthetic rubber, and artificial synthetic fibers and filaments manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0264 #08 Y:2007 Use synthetic lubricant $3,151 $500
LE0264 #07 Y:2007 Reduce the pressure of compressed air to the minimum required $3,184 $2,500
LE0264 #06 Y:2007 Reduce the pressure of compressed air to the minimum required $3,514 $200
LE0264 #05 Y:2007 Utilize energy-efficient belts and other improved mechanisms $4,084 $500
LE0264 #04 Y:2007 Repair faulty insulation in furnaces, boilers, etc $4,727 $2,250
LE0264 #03 Y:2007 Install timers and/or thermostats $4,204 $2,000
LE0264 #02 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $10,103 $2,500
LE0264 #01 Y:2007 Use or replace with energy efficient substitutes $25,680 $50,000
OK0751 #03 Y:2007 Begin a practice of predictive / preventative maintenance $2,188 $200
OK0751 #02 Y:2007 Re-arrange equipment layout to reduce handling costs $59,692 $201,700
OK0751 #01 Y:2007 Recover waste heat from equipment $2,572 $2,401
LL0279 #08 Y:2007 Conserve energy by efficient use of vending machines $1,151 $1,580
LL0279 #07 Y:2007 Install occupancy sensors $1,451 $840
LL0279 #06 Y:2007 Begin a practice of predictive / preventative maintenance $1,535 $30
LL0279 #05 Y:2007 Eliminate or reduce compressed air usage $1,945 $3,767
LL0279 #04 Y:2007 Reduce space conditioning during non-working hours $2,145 $2,490
LL0279 #03 Y:2007 Use waste heat from hot flue gases to preheat $24,724 $40,000
LL0279 #02 Y:2007 Reduce space conditioning during non-working hours $25,889 $5,250
LL0279 #01 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $132,215 $49,640
UD0755 #12 Y:2006 Insulate glazing, walls, ceilings, and roofs $2,928 $42,500