ITAC Assessment: LL0279
ITAC logo
ITAC Assessment: LL0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Plastics
NAICS 325220: Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range greater than $500
M
# of Employees 200
Plant Area 75,000
ft2
Annual Production 320,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,175,673 59,700,734
kWh
Electricity Demand $768,926 83,318
kW-mo/yr
Natural Gas $1,522,272 189,461
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $191,055 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $132,215

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $132,215 $49,640 $106,766
2,007,253
kWh
$25,449
-
kW-mo/yr
- -
02 2.7224: Reduce space conditioning during non-working hours $25,889 $5,250 $25,889
486,720
kWh
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $24,724 $40,000 - - $24,724
-
MMBtu
-
04 2.7224: Reduce space conditioning during non-working hours $2,145 $2,490 $2,145
40,324
kWh
- - -
05 2.4239: Eliminate or reduce compressed air usage $1,945 $3,767 $1,945
36,565
kWh
- - -
06 4.611: Begin a practice of predictive / preventative maintenance $1,535 $30 $35
664
kWh
- - $1,500
07 2.7135: Install occupancy sensors $1,451 $840 $1,451
27,279
kWh
- - -
08 2.6211: Conserve energy by efficient use of vending machines $1,151 $1,580 $929
17,472
kWh
$222
-
kW-mo/yr
- -
TOTAL RECOMMENDED $191,055 $103,597 $139,160
2,616,277
kWh
$25,671
-
kW-mo/yr
$24,724
-
MMBtu
$1,500
TOTAL IMPLEMENTED $132,215 $49,640 $106,766
2,007,253
kWh
$25,449
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs