Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

979

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin, synthetic rubber, and artificial synthetic fibers and filaments manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2216 #09 Y:2022 Use evaporation to concentrate material $104,200 $500,000
LS2216 #08 Y:2022 Use filter and drying oven to reduce sludge volume $49,168 $91,825
LS2216 #07 Y:2022 Eliminate practice of mixing waste streams $50,000 $64,300
LS2216 #06 Y:2022 Utilize energy-efficient belts and other improved mechanisms $42 $50
LS2216 #05 Y:2022 Utilize higher efficiency lamps and/or ballasts $48,044 $18,502
LS2216 #04 Y:2022 Install occupancy sensors $1,095 $350
LS2216 #03 Y:2022 Use photocell controls $251 $74
LS2216 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $2,917 $450
LS2216 #01 Y:2022 Install timers and/or thermostats $1,899 $150
GT0959 #06 Y:2022 Use solar heat to make electricty $37,630 $621,000
GT0959 #05 Y:2022 Use / purchase optimum sized compressor $6,169 $23,000
GT0959 #04 Y:2022 Utilize controls to operate equipment only when needed $170 $315
GT0959 #03 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $3,641 $1,850
GT0959 #02 Y:2022 Install timers and/or thermostats $184 $50
GT0959 #01 Y:2022 Apply for tax-free status for energy purchases $11,495 $800
TT0268 #07 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $2,442 $6,000
TT0268 #06 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $2,691 $2,695
TT0268 #05 Y:2022 Change rate schedules or other changes in utility service $4,223 $500
TT0268 #04 Y:2022 Reduce the pressure of compressed air to the minimum required $9,268 $3,480
TT0268 #03 Y:2022 Optimize plant power factor $14,583 $49,071