Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,190

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin, synthetic rubber, and artificial synthetic fibers and filaments manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0371 #05 Y:2025 Replace boiler $383,764 $475,000
MZ0371 #04 Y:2025 Use waste heat from hot flue gases to preheat incoming fluids $1,555 $5,880
MZ0371 #03 Y:2025 Use flue gases to heat process or service water $1,063 $3,900
MZ0371 #02 Y:2025 Meter recycled water (to reduce sewer charges) $4,583 $70,000
MZ0371 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,847 $3,600
IC0322 #11 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $205 $144
IC0322 #10 Y:2024 Eliminate or reduce compressed air usage $1,536 $2,000
IC0322 #09 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,919 -
IC0322 #08 Y:2024 Install timers and/or thermostats $4,457 $211
IC0322 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,658 $693
IC0322 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $25,000 $1,250
IC0322 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,041 $210
IC0322 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $15,262 $24,421
IC0322 #03 Y:2024 Increase amount of condensate returned $36,404 $43,673
IC0322 #02 Y:2024 Use waste heat from hot flue gases to preheat incoming fluids $5,455 $41,668
IC0322 #01 Y:2024 Replace obsolete burners with more efficient ones $102,930 $45,500
KS2438 #09 Y:2024 Use solar heat to make electricty $415,341 $4,074,007
KS2438 #08 Y:2024 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $106,671 $712,500
KS2438 #07 Y:2024 Replace boiler $50,929 $423,280
KS2438 #06 Y:2024 Use waste heat from hot flue gases to preheat $33,307 $75,751