Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other basic inorganic chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0468 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,146 $12,242
MI0468 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,443 $4,136
MI0468 #04 Y:2025 Install occupancy sensors $3,143 $1,775
MI0468 #03 Y:2025 Use solar heat to make electricty $96,937 $3,200
MI0468 #02 Y:2025 Lower temperature during the winter season and vice-versa $15,745 $240
MI0468 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $120,439 $200
MI0393 #06 Y:2021 Utilize higher efficiency lamps and/or ballasts $5,748 $2,211
MI0393 #05 Y:2021 Use solar heat to heat water $12,942 $72,248
MI0393 #04 Y:2021 Upgrade controls on compressors $11,648 $3,107
MI0393 #03 Y:2021 Install compressor air intakes in coolest locations $4,195 $1,126
MI0393 #02 Y:2021 Lower temperature during the winter season and vice-versa $685 $480
MI0393 #01 Y:2021 Optimize plant power factor $100,476 $227,400
UF0558 #05 Y:2021 Separate and recycle scrap metal to foundry or for sale $40,098 $110,800
UF0558 #04 Y:2021 Use filtration, centrifuging to remove contaminants $1,517,489 $143,275
UF0558 #03 Y:2021 Add equipment/ operators to reduce production bottleneck $42,983 $7,127
UF0558 #02 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $1,420 $456
UF0558 #01 Y:2021 Use most efficient type of electric motors $20,597 $19,045