ITAC Assessment: UF0558
ITAC logo
ITAC Assessment: UF0558
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Alternative Fuels
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 103,000
ft2
Annual Production 26,149
ton
Production Hrs. Annual 5,824
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,800 1,608,806
kWh
Electricity Demand $90,522 7,670
kW-mo/yr
Electricity Fees $44,306 -
TOTAL YEARLY COSTS $209,628
RECOMMENDED SAVINGS* $1,622,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,622,587

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $20,597 $19,045 $11,740
255,218
kWh
$8,857
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,420 $456 $1,420
30,872
kWh
- - -
03 4.111: Add equipment/ operators to reduce production bottleneck $42,983 $7,127 $(-961.0)
(-20,888)
kWh
$(-1,056.5)
-
kW-mo/yr
- $45,000
04 3.3122: Use filtration, centrifuging to remove contaminants $1,517,489 $143,275 $(-172,059.0)
(-3,740,409)
kWh
$(-8,452.0)
-
kW-mo/yr
$(-102,000.0) $1,800,000
05 3.5248: Separate and recycle scrap metal to foundry or for sale $40,098 $110,800 $(-3,627.0)
(-78,840)
kWh
$(-1,274.6)
-
kW-mo/yr
- $45,000
TOTAL RECOMMENDED $1,622,587 $280,703 $(-163,487.0)
(-3,554,047)
kWh
$(-1,926.1)
-
kW-mo/yr
$(-102,000.0) $1,890,000
TOTAL IMPLEMENTED $1,622,587 $280,703 $(-163,487.0)
(-3,554,047)
kWh
$(-1,926.1)
-
kW-mo/yr
$(-102,000.0) $1,890,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs