ITAC Assessment: MI0393
ITAC logo
ITAC Assessment: MI0393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Chemical Bleach
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 31
Plant Area 44,000
ft2
Annual Production 30,000
Tgal
Production Hrs. Annual 8,568
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,911,286 41,280,592
kWh
Electricity Demand $92,608 67,786
kW-mo/yr
Electricity Fees $243,187 -
Natural Gas $30,600 9,153
MMBtu
TOTAL YEARLY COSTS $2,277,681
RECOMMENDED SAVINGS* $135,694 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,433

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $100,476 $227,400 - - $100,476 -
02 2.7221: Lower temperature during the winter season and vice-versa $685 $480 $660
13,210
kWh
$25
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $4,195 $1,126 $4,043
80,872
kWh
$152
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $11,648 $3,107 $11,226
224,511
kWh
$422
-
kW-mo/yr
- -
05 2.9112: Use solar heat to heat water $12,942 $72,248 - - - $12,942
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,748 $2,211 $5,092
101,833
kWh
$656
-
kW-mo/yr
- -
TOTAL RECOMMENDED $135,694 $306,572 $21,021
420,426
kWh
$1,255
-
kW-mo/yr
$100,476 $12,942
-
MMBtu
TOTAL IMPLEMENTED $6,433 $2,691 $5,752
115,043
kWh
$681
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs