Assessment Year | 2021 |
---|---|
Principal Product | Chemical Bleach |
NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 31 |
Plant Area |
44,000
ft2
|
Annual Production | 30,000
Tgal
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,911,286 | 41,280,592 |
kWh
|
$0.046 |
Electricity Demand | $92,608 | 67,786 |
kW-mo/yr
|
$1.37 |
Electricity Fees | $243,187 | - |
|
- |
Natural Gas | $30,600 | 9,153 |
MMBtu
|
$3.34 |
TOTAL YEARLY COSTS | $2,277,681 | |||
RECOMMENDED SAVINGS* | $135,694 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,433 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $100,476 | $227,400 | - | - | $100,476 | - | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $685 | $480 |
$660
13,210
kWh
|
$25
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $4,195 | $1,126 |
$4,043
80,872
kWh
|
$152
-
kW-mo/yr
|
- | - | |
04 | 2.4224: Upgrade controls on compressors | $11,648 | $3,107 |
$11,226
224,511
kWh
|
$422
-
kW-mo/yr
|
- | - | |
05 | 2.9112: Use solar heat to heat water | $12,942 | $72,248 | - | - | - |
$12,942
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,748 | $2,211 |
$5,092
101,833
kWh
|
$656
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $135,694 | $306,572 |
$21,021
420,426
kWh
|
$1,255
-
kW-mo/yr
|
$100,476 |
$12,942
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,433 | $2,691 |
$5,752
115,043
kWh
|
$681
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs