ITAC Assessment: UD1125
ITAC logo
ITAC Assessment: UD1125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Electrical and Electronic Components for Automobiles
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 265
Plant Area 1,000,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,314,669 26,298,595
kWh
Electricity Demand $568,767 54,686
kW-mo/yr
Electricity Fees $116,573 -
Natural Gas $424,512 231,018
MMBtu
Waste Disposal Costs
Water Usage $147,527 27,396
Tgal
Water Disposal $213,773 27,542
Tgal
Other Liquid (non-haz) $5,087 1
gal
TOTAL YEARLY COSTS $2,790,908
RECOMMENDED SAVINGS* $95,669 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
01 2.8123: Pay utility bills on time $11,153 - - - $6,309 $982
-
MMBtu
$3,862
-
gal
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,992 $953 $16,337
326,740
kWh
$4,655
-
kW-mo/yr
- - - -
03 2.4239: Eliminate or reduce compressed air usage $4,431 - $4,431
88,625
kWh
- - - - -
04 2.7224: Reduce space conditioning during non-working hours $57,613 $3,735 $28,352
567,046
kWh
- - $29,261
-
MMBtu
- -
05 2.7135: Install occupancy sensors $1,480 $1,208 $377
7,540
kWh
$384
-
kW-mo/yr
- - - $719
TOTAL RECOMMENDED $95,669 $5,896 $49,497
989,951
kWh
$5,039
-
kW-mo/yr
$6,309 $30,243
-
MMBtu
$3,862
-
gal
$719
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs