Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Petrochemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0676 #09 Y:2015 Utilize energy-efficient belts and other improved mechanisms $785 -
AM0676 #08 Y:2015 Insulate bare equipment $1,140 $480
AM0676 #07 Y:2015 Utilize higher efficiency lamps and/or ballasts $4,420 $7,200
AM0676 #06 Y:2015 Use demand controller or load shedder $7,100 -
AM0676 #05 Y:2015 Repair and eliminate steam leaks $7,850 $4,000
AM0676 #04 Y:2015 Use demand controller or load shedder $10,438 -
AM0676 #03 Y:2015 Optimize plant power factor $10,520 $46,590
AM0676 #02 Y:2015 Recover waste heat from equipment $12,300 $100,000
AM0676 #01 Y:2015 Repair or replace steam traps $54,800 $13,155
MI0222 #08 Y:2012 Install skylights $2,227 $960
MI0222 #07 Y:2012 Utilize energy-efficient belts and other improved mechanisms $2,893 $80
MI0222 #06 Y:2012 Utilize higher efficiency lamps and/or ballasts $3,797 $2,726
MI0222 #05 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $10,363 $1,660
MI0222 #04 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $31,498 $6,660
MI0222 #03 Y:2012 Analyze flue gas for proper air/fuel ratio $38,910 $2,520
MI0222 #02 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $44,472 $19,980
MI0222 #01 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $94,284 $46,620
MZ0042 #05 Y:2009 Condense operation into one building $543,300 $150,000
MZ0042 #04 Y:2009 Utilize higher efficiency lamps and/or ballasts $23,970 $214,200
MZ0042 #03 Y:2009 Install occupancy sensors $905 $905