Assessment Year | 2015 |
---|---|
Principal Product | Organic chemicals |
NAICS | 325110: Petrochemical Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 61 |
Plant Area |
50,000
ft2
|
Annual Production | 50,000,000
units
|
Production Hrs. Annual | 8,424
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $513,728 | 11,573,456 |
kWh
|
$0.044 |
Electricity Demand | $140,312 | 18,884 |
kW-mo/yr
|
$7.43 |
Electricity Fees | $43,478 | - |
|
- |
Natural Gas | $1,897,430 | 443,221 |
MMBtu
|
$4.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $109,947 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $62,650 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2113: Repair or replace steam traps | $54,800 | $13,155 | - | - | - |
$54,800
-
MMBtu
|
- | |
02 | 2.2437: Recover waste heat from equipment | $12,300 | $100,000 | - | - | - |
$12,300
-
MMBtu
|
- | |
03 | 2.3212: Optimize plant power factor | $10,520 | $46,590 | - |
$10,520
-
kW-mo/yr
|
- | - | - | |
04 | 2.3191: Use demand controller or load shedder | $10,438 | - | - | - | $10,438 | - | - | |
05 | 2.2135: Repair and eliminate steam leaks | $7,850 | $4,000 | - | - | - |
$7,850
-
MMBtu
|
- | |
06 | 2.3191: Use demand controller or load shedder | $7,100 | - | - |
$7,100
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,420 | $7,200 |
$2,520
49,570
kWh
|
$460
-
kW-mo/yr
|
- | - | $1,440 | |
08 | 2.2511: Insulate bare equipment | $1,140 | $480 | - | - | - |
$1,140
-
MMBtu
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $785 | - |
$665
13,060
kWh
|
$120
-
kW-mo/yr
|
- | - | - | |
10 | 2.4314: Use synthetic lubricant | $594 | - |
$493
9,742
kWh
|
$101
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $109,947 | $171,425 |
$3,678
72,372
kWh
|
$18,301
-
kW-mo/yr
|
$10,438 |
$76,090
-
MMBtu
|
$1,440 | ||
TOTAL IMPLEMENTED | $62,650 | $17,155 | - | - | - |
$62,650
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs