Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Petrochemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0268 #06 Y:2025 Use optimum temperature $680,810 $2,017,330
UU0268 #05 Y:2025 Convert combustion equipment to burn natural gas $11,222 $30,630
UU0268 #04 Y:2025 Increase amount of condensate returned $31,296 $7,800
UU0268 #03 Y:2025 Install / repair insulation on steam lines $8,514 $6,920
UU0268 #02 Y:2025 Burn a less expensive grade of fuel $101,028 $4,860
UU0268 #01 Y:2025 Use hot process fluids to preheat incoming process fluids $25,676 $9,660
UD0966 #09 Y:2017 Use steam pressure reduction to generate power $76,595 $198,657
UD0966 #08 Y:2017 Use steam pressure reduction to generate power $229,882 $595,039
UD0966 #07 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $383,642 $613,600
UD0966 #06 Y:2017 Utilize energy-efficient belts and other improved mechanisms $14,748 $4,000
UD0966 #05 Y:2017 Reschedule and rearrange multiple-source heating systems $57,432 $35,000
UD0966 #04 Y:2017 Use or replace with energy efficient substitutes $8,225 $4,000
UD0966 #03 Y:2017 Improve combustion control capability $270,579 $100,000
UD0966 #02 Y:2017 Install timers and/or thermostats $12,245 $25,000
UD0966 #01 Y:2017 Use highest temperature for chilling or cold storage $217,648 $48,962
AM0711 #10 Y:2016 Pay bills on time to avoid late fees $471 -
AM0711 #09 Y:2016 Use synthetic lubricant $1,072 -
AM0711 #08 Y:2016 Analyze flue gas for proper air/fuel ratio $2,880 -
AM0711 #07 Y:2016 Use or replace with energy efficient substitutes $4,344 $2,620
AM0711 #06 Y:2016 Reduce the pressure of compressed air to the minimum required $11,000 $13