Assessment Year | 2016 |
---|---|
Principal Product | Organic peroxides |
NAICS | 325110: Petrochemical Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 60 |
Plant Area |
640,000
ft2
|
Annual Production | 11,100,000
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $599,657 | 14,859,841 |
kWh
|
$0.040 |
Electricity Demand | $252,813 | 26,116 |
kW-mo/yr
|
$9.68 |
Electricity Fees | $2,048 | - |
|
- |
Natural Gas | $132,299 | 33,284 |
MMBtu
|
$3.97 |
TOTAL YEARLY COSTS | $986,817 | |||
RECOMMENDED SAVINGS* | $166,212 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,860 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $62,500 | $108,300 |
$47,000
1,163,640
kWh
|
$15,500
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,350 | $57,195 |
$19,050
471,613
kWh
|
$6,300
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $22,630 | $9,030 |
$16,790
415,600
kWh
|
$5,840
-
kW-mo/yr
|
- | - | - | |
04 | 2.3212: Optimize plant power factor | $18,515 | $60,200 | - |
$18,515
-
kW-mo/yr
|
- | - | - | |
05 | 2.2135: Repair and eliminate steam leaks | $17,450 | $26 | - | - | - |
$17,450
-
MMBtu
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $11,000 | $13 |
$8,160
201,900
kWh
|
$2,840
-
kW-mo/yr
|
- | - | - | |
07 | 2.4322: Use or replace with energy efficient substitutes | $4,344 | $2,620 |
$174
4,296
kWh
|
$4,170
-
kW-mo/yr
|
- | - | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,880 | - | - | - | - |
$3,480
-
MMBtu
|
$(-600.0) | |
09 | 2.4314: Use synthetic lubricant | $1,072 | - |
$728
18,020
kWh
|
$344
-
kW-mo/yr
|
- | - | - | |
10 | 4.821: Pay bills on time to avoid late fees | $471 | - | - | - | $471 | - | - | |
TOTAL RECOMMENDED | $166,212 | $237,384 |
$91,902
2,275,069
kWh
|
$53,509
-
kW-mo/yr
|
$471 |
$20,930
-
MMBtu
|
$(-600.0) | ||
TOTAL IMPLEMENTED | $50,860 | $66,225 |
$35,840
887,213
kWh
|
$12,140
-
kW-mo/yr
|
- |
$3,480
-
MMBtu
|
$(-600.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs