ITAC Assessment: OK0765
ITAC logo
ITAC Assessment: OK0765
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Reed switches and proxy sensors
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area 90,000
ft2
Annual Production 5,100,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,673 778,320
kWh
Natural Gas $18,367 1,737
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7135: Install occupancy sensors $1,794 $2,151 $1,794
23,063
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $340 - $340
4,469
kWh
03 4.611: Begin a practice of predictive / preventative maintenance $1,600 - $1,600
-
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,176 $4,690 $1,176
15,333
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,974 $18,623 $3,974
1,942
kWh
06 2.1321: Replace fossil fuel equipment with electrical equipment $42,105 $161,000 $42,105
142,181
kWh
TOTAL RECOMMENDED $50,989 $186,464 $50,989
186,988
kWh
TOTAL IMPLEMENTED $46,419 $179,623 $46,419
148,592
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs