Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,137

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Basic chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0275 #07 Y:2026 Use heat pump for space conditioning $1,195 $14,500
DL0275 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $4,492 $4,837
DL0275 #05 Y:2026 Use proper thickness of insulation on building envelope $133 $125
DL0275 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,007 $5,500
DL0275 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $12,658 $19,500
DL0275 #02 Y:2026 Recover waste heat from equipment $7,918 $10,000
DL0275 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $27,007 $22,000
OR0830 #03 Y:2026 Use solar heat to make electricty $70,737 $992,750
OR0830 #02 Y:2026 Utilize controls to operate equipment only when needed $41,804 $330,355
OR0830 #01 Y:2026 Install timers on light switches in little used areas $8,099 $3,940
UW2518 #06 Y:2025 Replace fossil fuel equipment with electrical equipment $16,903 $102,300
UW2518 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,286 $28,047
UW2518 #04 Y:2025 Install occupancy sensors $795 $1,729
UW2518 #03 Y:2025 Install vinyl strip / high speed / air curtain doors $13,675 $64,800
UW2518 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $59,635 $40,500
UW2518 #01 Y:2025 Install back-up equipment $150,000 $1,963,087
MI0468 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,146 $12,242
MI0468 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,443 $4,136
MI0468 #04 Y:2025 Install occupancy sensors $3,143 $1,775
MI0468 #03 Y:2025 Use solar heat to make electricty $96,937 $3,200