Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,127

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Basic chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2518 #06 Y:2025 Use or replace with energy efficient substitutes $18,560 $100,800
UW2518 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,286 $28,047
UW2518 #04 Y:2025 Use photocell controls $795 $1,729
UW2518 #03 Y:2025 Install vinyl strip / high speed / air curtain doors $13,675 $64,800
UW2518 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $59,635 $40,500
UW2518 #01 Y:2025 Install back-up equipment $172,619 $196,087
MI0468 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,146 $12,242
MI0468 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,443 $4,136
MI0468 #04 Y:2025 Install occupancy sensors $3,143 $1,775
MI0468 #03 Y:2025 Use solar heat to make electricty $96,937 $3,200
MI0468 #02 Y:2025 Lower temperature during the winter season and vice-versa $15,745 $240
MI0468 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $120,439 $200
UL2514 #05 Y:2025 Ventilation system to shut off when room is not in use $1,193 -
UL2514 #04 Y:2025 Use computer programs to optimize hvac performance $11,076 $19,500
UL2514 #03 Y:2025 Use solar heat to make electricty $11,054 $88,745
UL2514 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,475 $3,938
UL2514 #01 Y:2025 Change rate schedules or other changes in utility service $41,000 -
MU0074 #07 Y:2025 Lower temperature during the winter season and vice-versa $1,235 $166
MU0074 #06 Y:2025 Install occupancy sensors $68 $404
MU0074 #05 Y:2025 Reduce illumination to minimum necessary levels $2,223 -