30
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | All other petroleum and coal products manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LS2509 #07 Y:2024 | 07 | 2024 | Insulate bare equipment | $214,970 | $1,500,000 |
n/a
|
LS2509 #06 Y:2024 | 06 | 2024 | Replace fossil fuel equipment with electrical equipment | $53,529 | $144,549 |
n/a
|
LS2509 #05 Y:2024 | 05 | 2024 | Use most efficient type of electric motors | $1,218 | $2,700 |
n/a
|
LS2509 #04 Y:2024 | 04 | 2024 | Replace existing equipment with more suitable substitutes | $127,011 | $200,000 |
n/a
|
LS2509 #03 Y:2024 | 03 | 2024 | Improve process control to prevent spills of material | $56,956 | $80,000 |
n/a
|
LS2509 #02 Y:2024 | 02 | 2024 | Size electric motors for peak operating efficiency | $12,547 | $16,300 |
n/a
|
LS2509 #01 Y:2024 | 01 | 2024 | Use / purchase optimum sized compressor | $40,834 | $25,000 |
n/a
|
AM0524 #08 Y:2006 | 08 | 2006 | Make a practice of turning off lights when not needed | $300 | - | |
AM0524 #07 Y:2006 | 07 | 2006 | Use synthetic lubricant | $810 | - | |
AM0524 #06 Y:2006 | 06 | 2006 | Install / repair insulation on steam lines | $1,300 | $280 | |
AM0524 #05 Y:2006 | 05 | 2006 | Utilize daylight whenever possible in lieu of artificial light | $1,740 | - | |
AM0524 #04 Y:2006 | 04 | 2006 | Utilize higher efficiency lamps and/or ballasts | $1,000 | $380 | |
AM0524 #03 Y:2006 | 03 | 2006 | Use waste heat from hot flue gases to preheat | $8,000 | $31,200 | |
AM0524 #02 Y:2006 | 02 | 2006 | Analyze flue gas for proper air/fuel ratio | $24,700 | $500 | |
AM0524 #01 Y:2006 | 01 | 2006 | Repair or replace steam traps | $65,000 | $1,100 | |
LL0253 #07 Y:2006 | 07 | 2006 | Utilize higher efficiency lamps and/or ballasts | $13,598 | $8,750 | |
LL0253 #06 Y:2006 | 06 | 2006 | Insulate bare equipment | $67,882 | $10,319 | |
LL0253 #05 Y:2006 | 05 | 2006 | Use photocell controls | $120,278 | $11,880 | |
LL0253 #04 Y:2006 | 04 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $169,857 | $39,760 | |
LL0253 #03 Y:2006 | 03 | 2006 | Reduce excessive boiler blowdown | $177,541 | $24,000 |