ITAC Assessment: LS2509
ITAC logo
ITAC Assessment: LS2509
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Calcine
NAICS 324199: All Other Petroleum and Coal Products Manufacturing
SIC 2999: Products of Petroleum and Coal, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 67
Plant Area 215,372
ft2
Annual Production 800,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $480,792 6,648,600
kWh
Electricity Demand $45,567 10,896
kW-mo/yr
Natural Gas $716,742 286,856
MMBtu
Other Energy $317,564 10,902
MMBtu
TOTAL YEARLY COSTS $1,560,665
RECOMMENDED SAVINGS* $507,065 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings Primary Product Savings
01 2.4226: Use / purchase optimum sized compressor $40,834 $25,000 $40,834
567,141
kWh
- - - -
02 2.4131: Size electric motors for peak operating efficiency $12,547 $16,300 $12,547
174,266
kWh
- - - -
03 3.7221: Improve process control to prevent spills of material $56,956 $80,000 - - - $55,000 $1,956
04 4.652: Replace existing equipment with more suitable substitutes $127,011 $200,000 $2,719
37,769
kWh
- - $124,292 -
05 2.4133: Use most efficient type of electric motors $1,218 $2,700 $1,218
16,921
kWh
- - - -
06 2.1321: Replace fossil fuel equipment with electrical equipment $53,529 $144,549 $(-2,076.0)
(-28,829)
kWh
- $31,605
-
MMBtu
$24,000 -
07 2.2511: Insulate bare equipment $214,970 $1,500,000 - $214,970
-
MMBtu
- - -
TOTAL RECOMMENDED $507,065 $1,968,549 $55,242
767,268
kWh
$214,970
-
MMBtu
$31,605
-
MMBtu
$203,292 $1,956
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs