| Assessment Year | 2006 |
|---|---|
| Principal Product | White & yellow mineral oil |
| NAICS | 324199: All Other Petroleum and Coal Products Manufacturing |
| SIC | 2999: Products of Petroleum and Coal, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 80 |
| Plant Area |
30,000
ft2
|
| Annual Production | 8,603
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $317,663 | 4,798,901 |
kWh
|
$0.066 |
| Electricity Demand | $72,414 | 10,661 |
kW-mo/yr
|
$6.79 |
| Electricity Fees | $1,182 | - |
|
- |
| Natural Gas | $692,460 | 88,152 |
MMBtu
|
$7.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $102,850 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $94,850 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2113: Repair or replace steam traps | $65,000 | $1,100 | - | - |
$65,000
-
MMBtu
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $24,700 | $500 | - | - |
$24,700
-
MMBtu
|
- | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $8,000 | $31,200 | - | - |
$8,000
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,000 | $380 |
$180
2,450
kWh
|
$20
-
kW-mo/yr
|
- | $800 | |
| 05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,740 | - |
$1,740
24,100
kWh
|
- | - | - | |
| 06 | 2.2136: Install / repair insulation on steam lines | $1,300 | $280 | - | - |
$1,300
-
MMBtu
|
- | |
| 07 | 2.4314: Use synthetic lubricant | $810 | - |
$685
9,500
kWh
|
$125
-
kW-mo/yr
|
- | - | |
| 08 | 2.7124: Make a practice of turning off lights when not needed | $300 | - |
$300
4,100
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $102,850 | $33,460 |
$2,905
40,150
kWh
|
$145
-
kW-mo/yr
|
$99,000
-
MMBtu
|
$800 | ||
| TOTAL IMPLEMENTED | $94,850 | $2,260 |
$2,905
40,150
kWh
|
$145
-
kW-mo/yr
|
$91,000
-
MMBtu
|
$800 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs