Assessment Year | 2016 |
---|---|
Principal Product | Encoders |
NAICS | 334519: Other Measuring and Controlling Device Manufacturing |
SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
100,800
ft2
|
Annual Production | 110,000
pieces
|
Production Hrs. Annual | 2,008
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $90,612 | 1,331,400 |
kWh
|
$0.068 |
Electricity Demand | $29,424 | 4,293 |
kW-mo/yr
|
$6.85 |
TOTAL YEARLY COSTS | $120,036 | |||
RECOMMENDED SAVINGS* | $5,272 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,392 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7423: Reduce heat gain by window tinting | $1,622 | $2,644 |
$1,622
23,860
kWh
|
- | |
02 | 2.7444: Close holes and openings in building such as broken windows | $698 | $505 |
$698
10,269
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $711 | $960 |
$624
9,180
kWh
|
$86
-
kW-mo/yr
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,328 | $3,080 |
$1,032
15,181
kWh
|
$296
-
kW-mo/yr
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $141 | $530 |
$141
2,082
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $370 | $15 |
$231
3,397
kWh
|
$139
-
kW-mo/yr
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $118 | $47 |
$118
1,736
kWh
|
- | |
08 | 2.7233: Use properly designed and sized hvac equipment | $117 | $340 |
$117
1,713
kWh
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $167 | $400 |
$143
2,097
kWh
|
$25
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $5,272 | $8,521 |
$4,726
69,515
kWh
|
$546
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $3,392 | $5,007 |
$2,846
41,860
kWh
|
$546
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs