ITAC Assessment: LL0253
ITAC logo
ITAC Assessment: LL0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product gasoline
NAICS 324199: All Other Petroleum and Coal Products Manufacturing
SIC 2911: Petroleum Refining
Sales Range greater than $500
M
# of Employees 1,200
Plant Area 2,100,000
ft2
Annual Production 143,000,000
bbl
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,048,861 1,220,173,572
kWh
Natural Gas $101,693,993 11,194,581
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,201,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $828,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.1336: Install equipment to utilize waste fuel $4,994,000 $250,000 - $4,994,000
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $658,473 $14,120 - $658,473
-
MMBtu
-
03 2.1241: Reduce excessive boiler blowdown $177,541 $24,000 - $177,541
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $169,857 $39,760 $169,857
2,352,586
kWh
- -
05 2.7134: Use photocell controls $120,278 $11,880 $120,278
1,665,894
kWh
- -
06 2.2511: Insulate bare equipment $67,882 $10,319 - $67,882
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $13,598 $8,750 $6,008
83,220
kWh
- $7,590
TOTAL RECOMMENDED $6,201,629 $358,829 $296,143
4,101,700
kWh
$5,897,896
-
MMBtu
$7,590
TOTAL IMPLEMENTED $828,330 $53,880 $169,857
2,352,586
kWh
$658,473
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs