Assessment Year | 2006 |
---|---|
Principal Product | gasoline |
NAICS | 324199: All Other Petroleum and Coal Products Manufacturing |
SIC | 2911: Petroleum Refining |
Sales Range | greater than $500 M |
# of Employees | 1,200 |
Plant Area |
2,100,000
ft2
|
Annual Production | 143,000,000
bbl
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $88,048,861 | 1,220,173,572 |
kWh
|
$0.072 |
Natural Gas | $101,693,993 | 11,194,581 |
MMBtu
|
$9.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,201,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $828,330 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1336: Install equipment to utilize waste fuel | $4,994,000 | $250,000 | - |
$4,994,000
-
MMBtu
|
- | |
02 | 2.2135: Repair and eliminate steam leaks | $658,473 | $14,120 | - |
$658,473
-
MMBtu
|
- | |
03 | 2.1241: Reduce excessive boiler blowdown | $177,541 | $24,000 | - |
$177,541
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $169,857 | $39,760 |
$169,857
2,352,586
kWh
|
- | - | |
05 | 2.7134: Use photocell controls | $120,278 | $11,880 |
$120,278
1,665,894
kWh
|
- | - | |
06 | 2.2511: Insulate bare equipment | $67,882 | $10,319 | - |
$67,882
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,598 | $8,750 |
$6,008
83,220
kWh
|
- | $7,590 | |
TOTAL RECOMMENDED | $6,201,629 | $358,829 |
$296,143
4,101,700
kWh
|
$5,897,896
-
MMBtu
|
$7,590 | ||
TOTAL IMPLEMENTED | $828,330 | $53,880 |
$169,857
2,352,586
kWh
|
$658,473
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs