ITAC Assessment: ND0282
ITAC logo
ITAC Assessment: ND0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product agricultural grain dryers
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 177,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 4,850
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,634 2,316,530
kWh
Natural Gas $74,503 17,984
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,498 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,111

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $8,615 $500 - - $8,615 -
02 2.4133: Use most efficient type of electric motors $1,081 $1,292 $1,081
18,464
kWh
- - -
03 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,450 $1,000 - $3,450
-
gal
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,130 $1,005 $1,130
18,171
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,055 $500 $1,055
18,171
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $866 $460 $866
14,947
kWh
- - -
07 2.7135: Install occupancy sensors $724 $1,000 $724
11,430
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $571 $108 $571
7,327
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $482 $910 $482
3,810
kWh
- - -
10 3.5316: Contract a wood pallet recycling company $360 - - - - $360
11 2.7122: Disconnect ballasts $92 $150 $92
1,465
kWh
- - -
12 2.6218: Turn off equipment when not in use $72 $50 $72
1,172
kWh
- - -
TOTAL RECOMMENDED $18,498 $6,975 $6,073
94,957
kWh
$3,450
-
gal
$8,615 $360
TOTAL IMPLEMENTED $2,111 $1,952 $2,111
36,048
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs