Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Commercial printing (except screen and books)
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0418 #08 Y:2005 Use solar heat to heat water $358 $2,800
AS0418 #07 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,386 $3,000
AS0418 #06 Y:2005 Use optimum size and capacity equipment $3,394 $1,900
AS0418 #05 Y:2005 Reduce the pressure of compressed air to the minimum required $4,272 $1,000
AS0418 #04 Y:2005 Install direct acting units in place of compressed air pressure system in safety system $6,612 $550
AS0418 #03 Y:2005 Replace existing hvac unit with high efficiency model $12,196 -
AS0418 #02 Y:2005 Eliminate/reduce redundant inspections $15,053 -
AS0418 #01 Y:2005 Utilize higher efficiency lamps and/or ballasts $21,182 $15,913
MA0600 #06 Y:2005 Reduce the pressure of compressed air to the minimum required $1,507 $5,000
MA0600 #05 Y:2005 Size electric motors for peak operating efficiency $1,683 $2,000
MA0600 #04 Y:2005 Optimize plant power factor $5,321 $10,000
MA0600 #03 Y:2005 Utilize higher efficiency lamps and/or ballasts $6,209 $17,438
MA0600 #02 Y:2005 Replace hydraulic / pneumatic equipment with electric equipment $8,271 $12,700
MA0600 #01 Y:2005 Use utility controlled power management $24,000 -
WV0335 #08 Y:2005 Use proper thickness of insulation on building envelope $985 $1,680
WV0335 #07 Y:2005 Burn waste oil for heat $1,494 $1,300
WV0335 #06 Y:2005 Utilize a less expensive cooling method $2,785 $5,803
WV0335 #05 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $2,865 $1,420
WV0335 #04 Y:2005 Develop a repair/replace policy $6,057 $240
WV0335 #03 Y:2005 Install compressor air intakes in coolest locations $8,924 $250