ITAC Assessment: MA0600
ITAC logo
ITAC Assessment: MA0600
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Newspaper
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $1
M
to 5
M
# of Employees 150
Plant Area 70,000
ft2
Annual Production 3,000
ton
Production Hrs. Annual 7,300
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,594 2,050,800
kWh
Electricity Demand $42,341 5,442
kW-mo/yr
Natural Gas $16,578 1,390
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.8122: Use utility controlled power management $24,000 - - $24,000
-
kW-mo/yr
02 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $8,271 $12,700 $7,231
81,250
kWh
$1,040
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,209 $17,438 $5,431
61,030
kWh
$778
-
kW-mo/yr
04 2.3212: Optimize plant power factor $5,321 $10,000 - $5,321
-
kW-mo/yr
05 2.4131: Size electric motors for peak operating efficiency $1,683 $2,000 $1,683
18,909
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,507 $5,000 $1,317
14,800
kWh
$190
-
kW-mo/yr
TOTAL RECOMMENDED $46,991 $47,138 $15,662
175,989
kWh
$31,329
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs