ITAC Assessment: WV0335
ITAC logo
ITAC Assessment: WV0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Printed Materials
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 110,000
ft2
Annual Production 900,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $654,685 14,400,000
kWh
Electricity Demand $325,510 37,458
kW-mo/yr
Natural Gas $799,067 101,443
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $302,599 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $140,603

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2693: Use waste heat steam for absorption refrigeration $151,578 $97,142 $120,120
2,642,274
kWh
$31,458
-
kW-mo/yr
- - - -
02 2.2414: Use waste heat from hot flue gases to preheat $127,911 $14,450 - - $127,911
-
MMBtu
- - -
03 2.4221: Install compressor air intakes in coolest locations $8,924 $250 $7,073
155,583
kWh
$1,851
-
kW-mo/yr
- - - -
04 2.4151: Develop a repair/replace policy $6,057 $240 $5,371
118,079
kWh
$1,406
-
kW-mo/yr
- - $(-720.0) -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,865 $1,420 $2,318
50,973
kWh
$607
-
kW-mo/yr
- - - $(-60.0)
06 2.2628: Utilize a less expensive cooling method $2,785 $5,803 $2,717
59,772
kWh
$713
-
kW-mo/yr
- - $(-20.0) $(-625.0)
07 3.6124: Burn waste oil for heat $1,494 $1,300 - - $1,290
-
MMBtu
$204
-
gal
- -
08 2.7492: Use proper thickness of insulation on building envelope $985 $1,680 - - $985
-
MMBtu
- - -
TOTAL RECOMMENDED $302,599 $122,285 $137,599
3,026,681
kWh
$36,035
-
kW-mo/yr
$130,186
-
MMBtu
$204
-
gal
$(-740.0) $(-685.0)
TOTAL IMPLEMENTED $140,603 $23,593 $10,406
228,824
kWh
$2,726
-
kW-mo/yr
$128,896
-
MMBtu
- $(-740.0) $(-685.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs