Assessment Year | 2006 |
---|---|
Principal Product | Printed Materials |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
110,000
ft2
|
Annual Production | 900,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $654,685 | 14,400,000 |
kWh
|
$0.045 |
Electricity Demand | $325,510 | 37,458 |
kW-mo/yr
|
$8.69 |
Natural Gas | $799,067 | 101,443 |
MMBtu
|
$7.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $302,599 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $140,603 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2693: Use waste heat steam for absorption refrigeration | $151,578 | $97,142 |
$120,120
2,642,274
kWh
|
$31,458
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $127,911 | $14,450 | - | - |
$127,911
-
MMBtu
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $8,924 | $250 |
$7,073
155,583
kWh
|
$1,851
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4151: Develop a repair/replace policy | $6,057 | $240 |
$5,371
118,079
kWh
|
$1,406
-
kW-mo/yr
|
- | - | $(-720.0) | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,865 | $1,420 |
$2,318
50,973
kWh
|
$607
-
kW-mo/yr
|
- | - | - | $(-60.0) | |
06 | 2.2628: Utilize a less expensive cooling method | $2,785 | $5,803 |
$2,717
59,772
kWh
|
$713
-
kW-mo/yr
|
- | - | $(-20.0) | $(-625.0) | |
07 | 3.6124: Burn waste oil for heat | $1,494 | $1,300 | - | - |
$1,290
-
MMBtu
|
$204
-
gal
|
- | - | |
08 | 2.7492: Use proper thickness of insulation on building envelope | $985 | $1,680 | - | - |
$985
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $302,599 | $122,285 |
$137,599
3,026,681
kWh
|
$36,035
-
kW-mo/yr
|
$130,186
-
MMBtu
|
$204
-
gal
|
$(-740.0) | $(-685.0) | ||
TOTAL IMPLEMENTED | $140,603 | $23,593 |
$10,406
228,824
kWh
|
$2,726
-
kW-mo/yr
|
$128,896
-
MMBtu
|
- | $(-740.0) | $(-685.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs